Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 521.35 2.64 0.51  
1 SOUTH 24 PARAGANAS S24 Pgns Mechanical Proposed Ground water based DIHI NARAYANI piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affe , SM/13921 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2 of Dihi Narayani water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Mograhat-II] Assistant Engineer Junior Engineer ORD/000412/2022-2023 3810/SMD 29/12/2022 90 JAL PRAVAHIKA PVT. LTD. 22.29 0.00 0 0
2 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DIHI NARAYANI piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affe , SM/13921 Augmentation Construction of 250 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) including design and drawing of pile foundation and pile cap after soil investigation for Augmentation of DIHI NARAYANI MOUZA of Mograhat-II Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns district. [No. of FHTC = 1571] [TSM/014903] AE RWS, Alipore Division JE, RWS, DH-II ORD/000282/2023-2024 1566/SWD-I 27/07/2023 300 M/S. SUMAN ENTERPRISE 397.95 0.00 0 0
3 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DIHI NARAYANI piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affe , SM/13921 Augmentation Construction of Platform for providing FHTC for Ground water based DIHI NARAYANI piped water supply scheme at Mograhat-II block under South 24 Parganas W/S Division-I, PHE Dte. for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Areas of South 24 Parganas District. (SM/13921) ORD/000315/2024-2025 3248/SWD-I 19/07/2024 60 S.S. ENTERPRISE (DAKHIN HAZIPUR) 29.09 0.00 0 0
4 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DIHI NARAYANI piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affe , SM/13921 Augmentation Sinking of 02 (Two) nos. Rig bored 250mm x 150mm dia. & 300 mtr. deepTubewell by Rotary method for DIHI NARAYANI PWSS of MOGRAHAT-II block under South 24-Parganas W/S Division-I, P.H.E. Dte. forAugmentation of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24 Pgs. district. [SM/13921][2nd Call] AE RWS, Alipore Division ORD/000690/2022-2023 3479/SWD-I 15/03/2023 30 BENGAL ENTERPRISE 31.75 0.00 0 0
5 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DIHI NARAYANI piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affe , SM/13921 Augmentation Construction of 900mm Dia Double Row Hume Pipe Culvert for DIHI NARAYANI PWSS to accommodate FHTC under Mograhat-II Block in the District of South 24 Parganas for Augmentation of Surfacc Water Based Water Supply Scheme under South 24-Pgns. W/S Division-I, PHE Dte. (SM/13921) AE RWS, Alipore Division JE, RWS, DH-II ORD/000813/2023-2024 1149/SWD-I 07/03/2024 30 S.S. ENTERPRISE (DAKHIN HAZIPUR) 5.77 0.00 0 0
6 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DIHI NARAYANI piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affe , SM/13921 Augmentation Preparation and submission of Detailed Project Report of "DIHINARAYANI Ground Water Based Piped Water Supply Scheme" in MOGRAHAT-II block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. AE BSD ORD/000881/2022-2023 412/SWD-I 20/05/2022 15 GEO SOLUTION 2.76 2.64 95.65 0
7 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DIHI NARAYANI piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affe , SM/13921 Augmentation Material Requisition To Resource Division RTOR000203/2023-2024 630 19/05/2023 Resource Division 31.74 0.00 0 0
Total 521.34 2.64 0.51