Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 500.9 93.06 18.58  
1 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based KAMARIA ZONE - II piped water supply scheme to accommodate FHTC in JAYNAGAR-I block under South 24-Pgns W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 pgns district. , SM/13776 Augmentation Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/00002/2024-2025 BP-2024-25-01 05/04/2024 WBSEDCL 3.78 0.00 0 0
2 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based KAMARIA ZONE - II piped water supply scheme to accommodate FHTC in JAYNAGAR-I block under South 24-Pgns W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 pgns district. , SM/13776 Augmentation Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/01750/2023-2024 BP-2023-24-209 11/08/2023 WBSEDCL 20.67 0.00 0 0
3 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based KAMARIA ZONE - II piped water supply scheme to accommodate FHTC in JAYNAGAR-I block under South 24-Pgns W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 pgns district. , SM/13776 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, of Kamaria Zone-II water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Jaynagar-I] Assistant Engineer Junior Engineer ORD/000579/2022-2023 608/SMD 28/02/2023 90 CONCORD ENGINEERING 19.48 0.00 0 0
4 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based KAMARIA ZONE - II piped water supply scheme to accommodate FHTC in JAYNAGAR-I block under South 24-Pgns W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 pgns district. , SM/13776 Augmentation Construction of 350 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) including design and drawing of pile foundation and pile cap after soil investigation for Augmentation of KAMARIA (ZONE-II) MOUZA of JOYNAGAR-I Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns district. [No. of FHTC = 2051] [TSM/016159] AE BSD JE-1 ORD/000170/2023-2024 967/SWD-I 08/06/2023 300 MANASH GHOSH 359.97 62.90 17.47 50
5 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based KAMARIA ZONE - II piped water supply scheme to accommodate FHTC in JAYNAGAR-I block under South 24-Pgns W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 pgns district. , SM/13776 Augmentation Sinking of 02 (Two) nos. Rig bored 250mm x 150mm dia. & 300 mtr. deep Tubewell by Rotary method for KAMARIA (Zone-II) PWSS of JOYNAGAR-I block under South 24-Parganas W/S Division-I, P.H.E. Dte. for Augmentaion of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24 Pgs district. [TSM/016159] AE BSD ORD/000503/2022-2023 2894/SWD-I 13/02/2023 30 PURE RENOVATION GROUP 31.78 30.16 94.9 100
6 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based KAMARIA ZONE - II piped water supply scheme to accommodate FHTC in JAYNAGAR-I block under South 24-Pgns W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 pgns district. , SM/13776 Augmentation Material Requisition To Resource Division RTOR000092/2023-2024 294/SWD-I 25/04/2023 Resource Division 65.22 0.00 0 0
Total 500.90 93.06 18.58