Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 266.48 103.92 39  
1 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Payment of electric bill for new service connection under SMD, PHE Dte. BILL/00003/2023-2024 BP-2023-24-36 18/05/2023 WBSEDCL 2.40 0.00 0 0
2 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/01106/2023-2024 BP-2023-24-149 24/07/2023 WBSEDCL 6.21 0.00 0 0
3 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, of Jagadishpur water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Baruipur] Assistant Engineer Junior Engineer ORD/000472/2022-2023 3943/SMD 30/12/2022 90 BIDYUT KUMAR MUKHERJEE 10.70 10.19 95.23 80
4 SOUTH 24 PARAGANAS S24 Pgns Mechanical Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 2, of Jagadishpur water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Baruipur] ORD/000929/2023-2024 2905/SMD 29/08/2023 90 KARUNAMOY ENGINEERING 0.00 0.00 NAN 0
5 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Distressed / Affected stretches of different road under P&RD Deptt. in West Bengal due to pipeline laying work by PHED [Sl. No.26] BILL/00486/2024-2025 BP-2024-25-293 11/09/2024 WBSRDA SOUTH 24 PGS ALIPORE 10.71 0.00 0 0
6 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Sinking of 02 (two) nos. Rig bored 300mm x 200mm dia. & 300 mtr. deep Tubewell by Rotary method for JAGADISHPUR PWSS of Baruipur Block under South-24 Pns W/S- Divn-I, PHE Dte., within South 24 Parganas District. [TSM/014216] AE BSD ORD/000199/2022-2023 1547/SWD-I 12/10/2022 30 M/S SABITA ENTERPRISE 40.02 18.14 45.33 100
7 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Construction of 02 (Two) nos. chlorination room at JAGADISHPUR of Baruipur Block for disinfection of ground water from big dia tube well due to improvement of water supply in the water Scarcity area/non command area under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns district. [TSM/014216] AE BSD ORD/000200/2022-2023 1548/SWD-I 12/10/2022 60 NARAYAN ENTERPRISE 10.93 4.35 39.8 50
8 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Providing 100% FHTC & Laying distribution system from Big dia deep Tube Well under ground water based piped water supply scheme at JAGADISHPUR of BARUIPUR Block, under surface water based W/S scheme in the arsenic affected areas of South 24 Parganas dist. (No. of FHTC = 859) AE BSD JE-2 ORD/000325/2022-2023 2024/SWD-I 29/11/2022 90 A ONE CONSTRUCTION 149.52 68.71 45.95 90
9 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Preparation and submission of Detailed Project Report of JAGADISHPUR Ground Water Based Piped Water Supply Scheme in BARUIPUR PASCHIM Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. AE BSD ORD/000356/2021-2022 1960/SWD-I 27/01/2022 30 TECH VISION 2.62 2.53 96.56 100
10 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Additional work for Sinking of 02 (Two) nos. Rig bored 300mm X 200mm dia & 300 mtr. deep Tubewell to achieve 66 mtr. housing pipe by Rotary method for Water supply arrangement for JAGADISHPUR PWSS of BARUIPUR Block under South 24 Parganas Water Supply Division-I, PHE Dte. [TSM/014216] AE BSD ORD/000450/2023-2024 2105/SWD-I 30/08/2023 15 M/S SABITA ENTERPRISE 4.40 0.00 0 0
11 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Ground water based JAGADISHPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas. , SM/13075 Augmentation Material Requisition To Resource Division RTOR000106/2023-2024 294/SWD-I 25/04/2023 Resource Division 28.97 0.00 0 0
Total 266.48 103.91 38.99