Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
19 3,449.67 326.95 9.48  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Laying additional pipe line to connect the uncovered habitation for Augmentation of Kalaria (Zone-IB) W/S Scheme, Block-Canning-I under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000488/2024-2025 3547/AD 02/09/2024 45 SUPRITI ENTERPRISE 34.28 0.00 0 0
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Inter connection and rising main with supply of specials of Augmentation of Kalaria (Zone- IB) W/S Scheme, Block-Canning- I under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000492/2023-2024 1792/AD 26/07/2023 30 S.B. ENTERPRISE 8.75 1.77 20.23 35
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Kalaria W/S Scheme (Zone-IB), Block - Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-I] Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000520/2023-2024 2075/AD 07/08/2023 45 S.M. ENTERPRISE 7.33 3.58 48.84 100
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Kalaria W/S Scheme (Zone-IB), Block - Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-II] Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000521/2023-2024 2076/AD 07/08/2023 45 ASHIS ENTERPRISE 7.06 3.36 47.59 100
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Kalaria W/S Scheme (Zone-IB), Block - Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. (Pump House-III) Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000523/2023-2024 2077/AD 07/08/2023 45 ASHIS ENTERPRISE 7.05 3.43 48.65 100
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Laying of Distribution System, Providing Functional Household Tap Connection (FHTC) etc. of Ground Water Based Augmentation Piped Water Supply Scheme for Kalaria (Zone-IB), Block-Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. [No. of FHTC = 1422] (TSM/017465) Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000525/2023-2024 2141/AD 09/08/2023 90 SUPRITI ENTERPRISE 270.46 108.16 39.99 45
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Laying of Distribution System of Ground Water Based Augmentation Piped Water Supply Scheme for Kalaria (Zone-IA), Block-Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. (TSM/017465) Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000527/2023-2024 2142/AD 09/08/2023 90 PUTUL RANI MAITY 217.06 96.22 44.33 60
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Providing Functional Household Tap Connection (FHTC) of Ground Water Based Augmentation Piped Water Supply Scheme for Kalaria (Zone-IA), Block-Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. [No. of FHTC = 2133] (TSM/017465) Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000528/2023-2024 2143/AD 09/08/2023 90 PUTUL RANI MAITY 127.34 32.97 25.89 70
9 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Sinking of 03 (three) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Augmentation of Kalaria (Zone-IB) W/S Scheme, Block - Canning-I under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000558/2023-2024 2245/AD 11/08/2023 60 B.K. ENTERPRISE. 60.00 55.95 93.25 98
10 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for Kalaria (Zone-IA & IB) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Canning-I Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000616/2023-2024 2271/AD 14/08/2023 45 INDRANIL DUTTA & ASSOCIATES 7.51 7.51 100 98
11 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Construction of 23 Nos. different capacity R.C.C OHR (based on Departmental Design & Drawing ) with 20 mtr. staging height including Geo-Technical investigation, foundation, pipeline connection and cost of pipes , specials etc. for augmentation of different piped water supply scheme of Canning-I, Canning-II & Basanti Block under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/002461/2023-2024 1512/AD 13/03/2024 300 NATIONAL PROJECTS CONSTRUCTION CORPORATION LTD 2,624.49 0.00 0 30
12 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Material Requisition To Resource Division RTOR000065/2023-2024 268/AD 24/04/2023 Resource Division 42.51 0.00 0 0
13 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Quotation for 25 KVA DTR Shifting at Kalaria Zone-IA, PH-2 Water supply scheme under canning-I block. Reference ID-860304112. Application ID-100000111622. BILL/00648/2024-2025 BP-2024-25-154 10/07/2024 WBSEDCL 1.81 0.00 0 null
14 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/03869/2023-2024 BP-2023-24-396 02/12/2023 WBSEDCL 4.09 0.00 0 0
15 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1,2 & 3 Zone-IA & IB for Augmentation of Kalaria Water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-I] Assistant Engineer Junior Engineer ORD/000268/2023-2024 1128/SMD 24/04/2023 90 PADMA ENGINEERING CO. 26.98 13.41 49.7 100
16 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Supply & installation of LED board at Zone-I B PH-I of Kalaria water supply scheme under South 24 Pgs Mechanical Division PHE Dte.[ Block- [ Block- Canning-I ] Assistant Engineer Junior Engineer ORD/002426/2023-2024 371/SMSD 21/03/2024 15 KUSHANI ENTERPRISES 0.39 0.20 51.28 100
17 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Supply & installation of LED board at Zone-I A PH-I & 2 of Kalaria water supply scheme under South 24 Pgs Mechanical Division PHE Dte.[ Block- Canning-I ] Assistant Engineer Junior Engineer ORD/002428/2023-2024 372/SMSD 21/03/2024 15 S.B.ENTERPRISE 0.78 0.39 50 100
18 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Improvement of outdoor illumination arrangement with allied works at Kalaria Zone-1A PH-1 under Canning-I Block water supply scheme under SMD,PHE Dte. Assistant Engineer Junior Engineer ORD/002646/2023-2024 195/SMSD 12/02/2024 15 PADMA ENGINEERING CO. 0.89 0.00 0 100
19 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS , SM/18676 Augmentation Improvement of outdoor illumination arrangement with allied works at Kalaria Zone-1A PH-2 under Canning-I Block water supply scheme under SMD,PHE Dte. Assistant Engineer Junior Engineer ORD/002647/2023-2024 190/SMSD 09/02/2024 15 PADMA ENGINEERING CO. 0.89 0.00 0 100
Total 3,449.66 326.96 9.48