Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 3,235.61 71.46 2.21  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Inter connection and rising main with supply of specials of Augmentation of Harekrishnapur W/S Scheme, Block-Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte. (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000238/2023-2024 1390/AD 12/07/2023 15 SUPER CONSTRUCTION 23.70 5.27 22.24 80
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Harekrishnapur W/S Scheme, Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-II] Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000286/2023-2024 1539/AD 17/07/2023 45 RINAS INFRASTRUCTURE 7.08 0.00 0 0
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Harekrishnapur W/S Scheme, Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-III] Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000288/2023-2024 1540/AD 17/07/2023 45 MAA SOLAR ENTERPRISE 7.11 0.00 0 0
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Harekrishnapur W/S Scheme, Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-IV] Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000290/2023-2024 1541/AD 17/07/2023 45 MAA SOLAR ENTERPRISE 7.11 0.00 0 0
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Laying Distribution System, Providing Functional Household Tap Connection for Ground Water Based Augmentation Piped Water Supply Scheme for the Harekrishnapur, Block-Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [No. of FHTC = 2343] Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000315/2023-2024 1516/AD 15/07/2023 90 M/S SHIBAM ENTERPRISE 405.58 66.19 16.32 40
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for Harekrishnapur Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Basanti Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/002447/2023-2024 1513/AD 13/03/2024 45 M/S APEX ENGINEERING 7.15 0.00 0 0
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Construction of 23 Nos. different capacity R.C.C OHR (based on Departmental Design & Drawing ) with 20 mtr. staging height including Geo-Technical investigation, foundation, pipeline connection and cost of pipes , specials etc. for augmentation of different piped water supply scheme of Canning-I, Canning-II & Basanti Block under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/002461/2023-2024 1512/AD 13/03/2024 300 NATIONAL PROJECTS CONSTRUCTION CORPORATION LTD 2,624.49 0.00 0 30
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Material Requisition To Resource Division RTOR000003/2023-2024 120/AD 13/04/2023 Resource Division 0.34 0.00 0 0
9 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Material Requisition To Resource Division RTOR000031/2023-2024 235/AD 24/04/2023 Resource Division 109.70 0.00 0 0
10 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Material Requisition To Resource Division RTOR000140/2023-2024 852/AD 27/05/2023 Resource Division 1.72 0.00 0 0
11 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI , SM/18279 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1,2,3, & 4 for Augmentation of Harekrishnapur water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Basanti] Assistant Engineer Junior Engineer ORD/001514/2022-2023 894/SMD 27/03/2023 90 S.P. CONSTRUCTION 41.63 0.00 0 0
Total 3,235.60 71.46 2.21