Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 597.1 146.5 24.54  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF HARISHPUR (ZONE-II) PIPED WATER SUPPLY SCHEME, BLOCK : GOSABA, DISTRICT : SOUTH 24 PARGANAS , SM/17200 Augmentation Construction of 200 m³ capacity 20 M. staging height R.C.C. Over Head Water Reservoir, Laying distribution system & Providing FHTC etc of Ground Water Based Augmentation of Harishpur (Zone-II) piped water supply scheme of Gosaba Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. [No. of FHTC = 1474] Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/000259/2023-2024 1447/AD 13/07/2023 300 SAMSUL ENTERPRISE 489.25 141.26 28.87 60
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF HARISHPUR (ZONE-II) PIPED WATER SUPPLY SCHEME, BLOCK : GOSABA, DISTRICT : SOUTH 24 PARGANAS , SM/17200 Augmentation Inter connection and rising main with supply of specials of Augmentation of Harishpur (Zone-II) W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/002018/2022-2023 12924/AD 21/03/2023 45 MOUMITA ENTERPRISE 42.77 0.00 0 0
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF HARISHPUR (ZONE-II) PIPED WATER SUPPLY SCHEME, BLOCK : GOSABA, DISTRICT : SOUTH 24 PARGANAS , SM/17200 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for Harishpur (Zone-II) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Gosaba Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer 1,Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/002112/2022-2023 12878/AD 17/03/2023 45 TECH VISION 5.24 5.24 100 95
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF HARISHPUR (ZONE-II) PIPED WATER SUPPLY SCHEME, BLOCK : GOSABA, DISTRICT : SOUTH 24 PARGANAS , SM/17200 Augmentation Material Requisition To Resource Division RTOR000058/2023-2024 265/AD 24/04/2023 Resource Division 46.64 0.00 0 0
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF HARISHPUR (ZONE-II) PIPED WATER SUPPLY SCHEME, BLOCK : GOSABA, DISTRICT : SOUTH 24 PARGANAS , SM/17200 Augmentation Material Requisition To Resource Division RTOR000420/2023-2024 375/AD 19/01/2024 Resource Division 9.08 0.00 0 0
6 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF HARISHPUR (ZONE-II) PIPED WATER SUPPLY SCHEME, BLOCK : GOSABA, DISTRICT : SOUTH 24 PARGANAS , SM/17200 Augmentation Supply, installation and of 15 KVA servo motor operated copper wound line voltage stabilizer at PH No.-1 (Newly energized converted from DG power to WBSEDCL supply) of Harishpur water supply scheme under SMD, PHE Dte. (Block:-Gosaba). Assistant Engineer Junior Engineer ORD/000398/2022-2023 543/SMD 10/06/2022 30 SHIVAM ENTERPRISE 4.12 0.00 0 0
Total 597.10 146.49 24.53