Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 499.04 43.51 8.72  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Inter connection and rising main with supply of specials of Augmentation of Basanti (Zone-VII) W/S Scheme, Block-Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000102/2023-2024 505/AD 11/05/2023 15 SURYA ENTERPRISE 7.71 0.00 0 0
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Laying Distribution system for Augmentation of Basanti W/S Scheme (Zone - VII), Block - Basanti under Canning Sub - Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000127/2023-2024 145/AD 17/04/2023 60 ARISTOCON ENGINEERS'CO-OP. SOCIETY LTD. 161.26 38.87 24.1 55
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Retrofitting of distribution system for Providing Functional Household Tap Connection (FHTC) of Augmentation of Basanti (Zone-III and VII) W/S Scheme, Block-Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [No. of FHTC = 1767] Assistant Engineer, Canning sub division Junior Engineer, 2 CSD,Junior Engineer, 4 CSD ORD/000257/2023-2024 1445/AD 13/07/2023 60 M/S SWAPAN KUMAR PRADHAN 103.39 0.00 0 35
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-VII), Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-I] Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000496/2023-2024 1797/AD 26/07/2023 45 MONDAL ENTERPRISE (SALTLAKE) 7.35 0.00 0 0
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-VII) , Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-II] Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000498/2023-2024 1798/AD 26/07/2023 45 B.S.ENTERPRISE 7.09 0.00 0 0
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Construction of 250 m³ capacity R.C.C OHR (based on Departmental Design & Drawing) with 20 mtr. staging height including Geo- Technical investigation, foundation, pipeline connection and cost of pipes, specials etc. for augmentation of Basanti (Zone-VII) piped water supply scheme of Basanti Block under Canning Sub- Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000625/2023-2024 4327/AD 01/12/2023 300 R.S.CONSTRUCTION CO. 105.35 0.00 0 0
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Sinking of 02 (two) Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter of Basanti W/S Scheme (Zone-VII), Block - Basanti under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/001919/2022-2023 12461/AD 10/03/2023 45 SANDIP SARKAR 39.12 0.00 0 0
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for Basanti (Zone-VII) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Basanti Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/001937/2022-2023 11808/AD 22/02/2023 45 INDRANIL DUTTA & ASSOCIATES 4.64 4.64 100 0
9 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Material Requisition To Resource Division RTOR000027/2023-2024 232/AD 24/04/2023 Resource Division 36.13 0.00 0 0
10 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Material Requisition To Resource Division RTOR000156/2023-2024 1049/AD 15/06/2023 Resource Division 5.86 0.00 0 0
11 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF BASANTI (ZONE-VII) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15972 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1 & 2 Zone-VII of Basanti water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Basanti] Assistant Engineer Junior Engineer ORD/001505/2022-2023 874/SMD 23/03/2023 90 WESTERN ENGINEERING CO. 21.14 0.00 0 0
Total 499.03 43.51 8.72