Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 268.22 3.7 1.38  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Kalugachi W/S Scheme, Block - Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. (Pump House No. V) Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000286/2024-2025 2657/AD 21/06/2024 45 RABIUL GAZI 7.07 0.00 0 0
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Additional work for retrofitting of distribution system for Providing Functional Household Tap Connection (FHTC) to additional households (1500 nos.) in excess of IMIS in connection with Jal Jeevan Mission (JJM) and Jal Swapna for Kalugachi Water Supply Scheme including one year Operation & Maintenance of scheme, Block - Canning-II South 24 Pgs. District under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000334/2023-2024 1551/AD 17/07/2023 90 M/S. MIHIR KUMAR NASKAR 122.86 0.00 0 0
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Additional work inter connection & distribution at Kalugachi W/S Scheme, Block- Canning-II under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000350/2024-2025 722/CSD 27/06/2024 30 P.S. CONSTRUCTION 2.26 0.00 0 0
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Additional work for laying distribution in connection with FHTC work at AUGMENTATION AND RETROFITTING OF KALUGACHHI W/S Scheme, Block - Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. (SM/15478) Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/001016/2023-2024 3301/AD 07/10/2023 30 STAR ENGINEERS CO-OPERATIVE SOCIETY LIMITED 10.97 3.70 33.73 90
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Kaluagachi W/S Scheme, Block-Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. (PH - 4) Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/001683/2022-2023 11490/AD 15/02/2023 45 R CONSTRUCTION 7.11 0.00 0 0
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell (New) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No. - 4 for each zone of Augmentation of Kalugachi W/S Scheme, Block - Canning-II under Canning Sub Division of Alipore Division, PHE Dte. (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/001770/2022-2023 12043/AD 27/02/2023 30 ZINARUL ISLAM 19.59 0.00 0 0
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Material Requisition To Resource Division RTOR000005/2023-2024 116/AD 13/04/2023 Resource Division 0.34 0.00 0 0
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Material Requisition To Resource Division RTOR000136/2023-2024 850/AD 27/05/2023 Resource Division 1.72 0.00 0 0
9 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Material Requisition To Resource Division RTOR000262/2023-2024 3052/AD 28/09/2023 Resource Division 85.12 0.00 0 0
10 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF KALUGACHHI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15478 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H.1 of Kalugachi water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-II] Assistant Engineer Junior Engineer ORD/000035/2023-2024 985/SMD 05/04/2023 90 SUDIP PRADHAN 11.18 0.00 0 0
Total 268.23 3.70 1.38