Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 252.08 78.27 31.05  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Construction of boundary wall at Pump House No. - 2 at Lot No.-126 (Zone-I) W/S Scheme Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000311/2024-2025 2692/AD 24/06/2024 30 SURYA ENTERPRISE 8.72 0.00 0 0
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for Lot-126 (Zone-I & II) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Basanti Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/001946/2022-2023 10894/AD 04/02/2023 45 GANGA TUBEWELL AND HARDWARE 2.60 1.30 50 95
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Inter connection and rising main with supply of specials at Augmentation of Lot No. 126 W/S Scheme (Zone-I and II), Block-Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte. [Part - A] Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/002015/2022-2023 12921/AD 21/03/2023 30 JYOTI ENTERPRISES 14.41 6.63 46.01 100
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Inter connection and rising main with supply of specials at Augmentation of Lot No. 126 W/S Scheme (Zone-I and II), Block-Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte. [Part - B] Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/002016/2022-2023 12922/AD 21/03/2023 60 S.P. CONSTRUCTION (I) 97.64 47.66 48.81 80
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Material Requisition To Resource Division RTOR000039/2023-2024 244/AD 24/04/2023 Resource Division 84.63 0.00 0 0
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Material Requisition To Resource Division RTOR000397/2023-2024 355/AD 19/01/2024 Resource Division 4.31 0.00 0 0
7 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/00751/2023-2024 BP-2023-24-100 04/07/2023 WBSEDCL 15.67 0.00 0 0
8 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1 & 2 for Augmentation of Lot 126 Zone1 & 2 water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Basanti] Assistant Engineer Junior Engineer ORD/000016/2023-2024 951/SMD 04/04/2023 90 BARISAL TRADING CO. 22.30 20.88 93.63 80
9 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Improvement of outdoor Illumination arrangement with allied works at Pump House no.3 of Lot 126 (Zone-I) W/S Scheme under SMD, P.H.E. Dte. (Block-Basanti) Assistant Engineer Junior Engineer ORD/002704/2023-2024 1189/SMSD 08/09/2023 15 BARISAL TRADING CO. 0.90 0.90 100 100
10 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF LOT NO. 126 (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15464 Augmentation Improvement of outdoor Illumination arrangement with allied works at Pump House no.3 of Lot 126 (Zone-II) W/S Scheme under SMD, P.H.E. Dte. (Block-Basanti) Assistant Engineer Junior Engineer ORD/002705/2023-2024 1190/SMSD 08/09/2023 15 BARISAL TRADING CO. 0.90 0.90 100 100
Total 252.10 78.26 31.04