Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 317.32 9.56 3.01  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15107 Augmentation Additional work for retrofitting of distribution system for Providing Functional Household Tap Connection (FHTC) to additional households (1500 nos.) in excess of IMIS in connection with Jal Jeevan Mission (JJM) and Jal Swapna for Budhkhali Water Supply Scheme including one year Operation & Maintenance of scheme, Block - Canning-I South 24 Pgs. District under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/000337/2023-2024 1939/AD 02/08/2023 90 KIRON CONSTRUCTION 126.68 0.00 0 0
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15107 Augmentation Inter connection and rising main with supply of specials at PH-V of Budhkhali W/S Scheme, Block-Canning-I under Canning Sub-Division of Alipore Division, P.H.E. Dte. (2nd Call) Assistant Engineer, Canning sub division ORD/000735/2023-2024 2896/AD 19/09/2023 15 SUPER CONSTRUCTION 37.51 0.00 0 0
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15107 Augmentation Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell (New) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No. - 5 of Augmentation of Budhkhali W/S Scheme, Block - Canning-I under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/001666/2022-2023 11478/AD 15/02/2023 30 M.R.ENTERPRISE (II) 19.52 0.00 0 0
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15107 Augmentation Surging of 1no. Big dia Tubewell of Budhkhali W/S Scheme under JJM, Block - Canning - I under Canning Sub-Division under Alipore Division P.H.E. Dte. (TW-2) Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/001680/2023-2024 1357/CSD 19/12/2023 30 S.K.GOLUI 2.85 1.08 37.89 100
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15107 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Budhkhali W/S Scheme, Block-Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. (PH - 5) Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/001704/2022-2023 11668/AD 20/02/2023 45 BABAMONI CONSTRUCTION 7.09 0.00 0 0
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15107 Augmentation Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Budhkhali W/S Scheme, Block - Canning-I under Canning Sub Division of Alipore Division, PHE Dte. (TW No. 2 alternative Tubewell) Assistant Engineer, Canning sub division Junior Engineer, 4 CSD ORD/002377/2023-2024 1201/AD 29/02/2024 30 BHATTACHARJEE & CO. 19.52 8.48 43.44 100
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15107 Augmentation Material Requisition To Resource Division RTOR000071/2023-2024 272/AD 24/04/2023 Resource Division 88.67 0.00 0 0
8 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15107 Augmentation Quotation for new service ( power ) connection at Budhakhali PH-5 under Canning -I block (REF ID : 106673108) (APP ID: 1007939044) BILL/01157/2024-2025 BP-2024-25-233 08/08/2024 WBSEDCL 4.32 0.00 0 null
9 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15107 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H.1 for Augmentation of Budhkhali water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-I] Assistant Engineer Junior Engineer ORD/000025/2023-2024 959/SMD 04/04/2023 90 JYOTY SOLAR POWER 11.16 0.00 0 0
Total 317.30 9.56 3.01