Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 312.16 55.9 17.91  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation Laying damaged pipeline (balance portion) under Atharabeki Water Supply Scheme, due to widening and strengthening of Basanti-Kolkata Road within Dhuri Bus Stop and Fakirtakia, Block-Canning - II under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/000113/2021-2022 1196/AD 07/07/2021 45 ALOK ENTERPRISE (A UNIT OF SAKET TREXIM PVT. LTD.) 48.88 22.63 46.3 95
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation Additional work for retrofitting of distribution system for Providing Functional Household Tap Connection (FHTC) to additional households (1700 nos.) in excess of IMIS in connection with Jal Jeevan Mission (JJM) and Jal Swapna for Atharabeki Water Supply Scheme including one year Operation & Maintenance of scheme, Block - Canning-II South 24 Pgs. District under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000262/2023-2024 1450/AD 13/07/2023 90 SAMSUL ENTERPRISE 105.53 0.00 0 0
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation Sinking of 02 (two) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Augmentation of Atharabeki (Part-B) W/S Scheme, Block - Canning-II under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/001322/2022-2023 9784/AD 07/01/2023 45 KALPANA BUILDERS (II) 39.97 24.67 61.72 100
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell (New) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No. - 5 of Augmentation of Atharabeki W/S Scheme, Block - Canning-II under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/001667/2022-2023 11479/AD 15/02/2023 30 SATYAM CONSTRUCTION 19.55 8.60 43.99 100
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Atharabeki W/S Scheme, Block-Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. (PH - 5) Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/001685/2022-2023 11492/AD 15/02/2023 45 RAHUL ENTERPRISE 7.05 0.00 0 0
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation Material Requisition To Resource Division RTOR000004/2023-2024 119/AD 13/04/2023 Resource Division 0.34 0.00 0 0
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation Material Requisition To Resource Division RTOR000139/2023-2024 856/AD 27/05/2023 Resource Division 1.72 0.00 0 0
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation Material Requisition To Resource Division RTOR000733/2023-2024 557/AD 25/01/2024 Resource Division 73.82 0.00 0 0
9 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation PAYMENT OF ELECTRICITY BILL FOR NEW SERVICE CONNECTION UNDER SMD PHE DTE. BILL/04678/2023-2024 BP-2023-24-509 12/02/2024 WBSEDCL 4.20 0.00 0 0
10 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15097 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H.1 for Augmentation of Athrabaki water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-II] Assistant Engineer Junior Engineer ORD/000038/2023-2024 993/SMD 06/04/2023 90 MUKHERJEE ART CENTRE 11.10 0.00 0 0
Total 312.18 55.90 17.91