Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 2,240.99 114.27 5.1  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Inter connection and rising main with supply of specials of Augmentation of Basanti (Zone-V) W/S Scheme , Block-Canning- I under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000093/2023-2024 449/AD 03/05/2023 15 HI TECH ENTERPRISE 9.12 0.00 0 0
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Construction of OHR, Laying of Distribution System, Providing Functional Household Tap Connection of Augmentation Piped Water Supply Scheme for Basanti (Zone-I, II, IV, V & VI), Block-Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [No of FHTC=9052] Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000349/2023-2024 1659/AD 20/07/2023 300 M/S PATH MAKERS 2,061.38 79.68 3.87 35
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-V), Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-I] Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/001703/2022-2023 11667/AD 20/02/2023 45 SARKAR CONSTRUCTION 7.36 0.00 0 0
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Sinking of 03 (three) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Augmentation of Basanti (Zone-V) W/S Scheme, Block - Basanti under Canning Sub Division of Alipore Division, PHE Dte. (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/001726/2022-2023 11763/AD 21/02/2023 60 B.K. ENTERPRISE. 60.00 27.33 45.55 97
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for Basanti (Zone-V) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Basanti Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/001916/2022-2023 10942/AD 06/02/2023 45 INDRANIL DUTTA & ASSOCIATES 7.26 7.26 100 99
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-V) , Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-II] (2nd Call) Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/002047/2022-2023 13047/AD 24/03/2023 45 JAGANNATH CONSTRUCTION 7.11 0.00 0 0
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-V) , Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-III] (2nd call) Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/002048/2022-2023 13048/AD 24/03/2023 45 SABITA INFRASTRUCTURE 7.11 0.00 0 0
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Material Requisition To Resource Division RTOR000025/2023-2024 231/AD 24/04/2023 Resource Division 24.45 0.00 0 0
9 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Material Requisition To Resource Division RTOR000154/2023-2024 1050/AD 15/06/2023 Resource Division 13.83 0.00 0 0
10 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Charges for service connection at Pump house no-1 of Basant (Zone-V) BILL/00446/2024-2025 BP-2024-25-114 14/06/2024 WBSEDCL 5.46 0.00 0 null
11 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Charges for New service connection at Pump house no-3 of Basanti (Zone-V) water supply scheme. BILL/01153/2024-2025 BP-2024-25-234 08/08/2024 WBSEDCL 8.89 0.00 0 null
12 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION & RETROFITTING OF BASANTI (ZONE-V) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) , SM/15052 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1,2 & 3 for Augmentation of Basanti (Zone-5) water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Basanti] Assistant Engineer Junior Engineer ORD/000020/2023-2024 955/SMD 04/04/2023 90 A.S.ENTERPRISE 29.02 0.00 0 0
Total 2,240.99 114.28 5.1