Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 2,816.16 43.46 1.54  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF ATHARA BEKI (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS , SM/14985 Augmentation Laying Distribution System, Providing Functional Household Tap Connection of Ground Water Based Augmentation Piped Water Supply Scheme for Atharabeki (Part - B), Block-Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000030/2023-2024 169/AD 19/04/2023 60 SAMSUL ENTERPRISE 120.51 40.64 33.72 95
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF ATHARA BEKI (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS , SM/14985 Augmentation Inter connection and rising main with supply of specials of Augmentation of Atharabeki (Part-B) W/S Scheme, Block-Canning-II under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000092/2023-2024 448/AD 08/05/2023 15 ASHIS ENTERPRISE 13.07 0.00 0 0
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF ATHARA BEKI (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS , SM/14985 Augmentation Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Atharabenki (Part-B) W/S Scheme, Block - Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-I] Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/001763/2022-2023 11945/AD 24/02/2023 45 BANGA NIRMAN 7.36 0.00 0 0
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF ATHARA BEKI (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS , SM/14985 Augmentation Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Atharabeki (Part-B) W/S Scheme, Block - Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-II] Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/001765/2022-2023 12038/AD 27/02/2023 45 BANGA NIRMAN 7.10 0.00 0 0
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF ATHARA BEKI (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS , SM/14985 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for Athara Beki (Part-B) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Canning-II Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/001838/2022-2023 10937/AD 06/02/2023 45 TECH VISION 2.82 2.82 100 0
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF ATHARA BEKI (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS , SM/14985 Augmentation Construction of 23 Nos. different capacity R.C.C OHR (based on Departmental Design & Drawing ) with 20 mtr. staging height including Geo-Technical investigation, foundation, pipeline connection and cost of pipes , specials etc. for augmentation of different piped water supply scheme of Canning-I, Canning-II & Basanti Block under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD ORD/002461/2023-2024 1512/AD 13/03/2024 300 NATIONAL PROJECTS CONSTRUCTION CORPORATION LTD 2,624.49 0.00 0 30
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF ATHARA BEKI (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS , SM/14985 Augmentation Material Requisition To Resource Division RTOR000013/2023-2024 218/AD 21/04/2023 Resource Division 15.70 0.00 0 0
8 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF ATHARA BEKI (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS , SM/14985 Augmentation PAYMENT OF ELECTRICITY BILL FOR NEW SERVICE CONNECTION UNDER SMD PHE DTE. BILL/04679/2023-2024 BP-2023-24-510 12/02/2024 WBSEDCL 3.59 0.00 0 0
9 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF ATHARA BEKI (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS , SM/14985 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, of Atharabeki Part-B water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-II] Assistant Engineer Junior Engineer ORD/000524/2022-2023 393/SMD 15/02/2023 90 CHANDIMATA ELECTRICALS 21.52 0.00 0 0
Total 2,816.16 43.46 1.54