Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 325.32 48.33 14.86  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE - IV OF DIAMOND HARBOUR-I BLOCK WITHIN MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- , SM/14475 Augmentation Hiring of an Inspection Vehicle (Diesel Operated) for the use of "Mega Surface Based Water Supply Scheme for Falta-Mathurapur, District South 24 Parganas", under Diamond Harbour Sub-Division, of Alipore Division, P.H.E. Dte. (period from 01/05/2023 to 31/10/2023) Assistant Engineer, Diamond Harbour sub division Junior Engineer ORD/000081/2023-2024 27/DHSD 25/04/2023 184 SUMAN HALDER 2.40 0.00 0 0
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE - IV OF DIAMOND HARBOUR-I BLOCK WITHIN MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- , SM/14475 Augmentation Hiring of an Inspection Vehicle for the use of JJM related works under the office of the Assistant Engineer, Diamond Harbour Sub-Division, under Alipore Division, P.H.E. Dte. (period from 01/10/2023 to 30/09/2024) Assistant Engineer, Diamond Harbour sub division Junior Engineer,Junior Engineer 3 DHSD ORD/001268/2023-2024 449/DHSD 29/09/2023 366 M.P. ENTERPRISE (II) 4.80 0.00 0 0
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE - IV OF DIAMOND HARBOUR-I BLOCK WITHIN MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- , SM/14475 Augmentation Augmentation for Providing Functional Household Tap Connection (FHTC) from distribution system in Zone-IV at Diamond Harbour- I block under " Mega Surface Water Based Water Supply Scheme for Falta- Mathurapur, District South 24 Parganas" under Diamond Harbour Sub-Division of Alipore Division of PHE Dte. [No. of FHTC = 2510] Assistant Engineer, Diamond Harbour sub division,Assistant Engineer, Raidighi sub division Junior Engineer,Junior Engineer 2 DHSD ORD/001397/2022-2023 10869/AD 04/02/2023 90 PROJECT & MAINTENANCE 197.45 38.03 19.26 65
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE - IV OF DIAMOND HARBOUR-I BLOCK WITHIN MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- , SM/14475 Augmentation Construction of 400 cum. Capacity 20mtr. staging height RCC Over Head Reservoir at as per departmental design, drawing & specification etc.at Diamond Harbour-I block for Mega surface water surface water based water supply schemein 24 pgs (south) of D.H.S.D under AD PHE Dte. ORD/001433/2018-2019 5675/AD 09/03/2019 1825 PROJECT & MAINTENANCE 103.00 10.30 10 90
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE - IV OF DIAMOND HARBOUR-I BLOCK WITHIN MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- , SM/14475 Augmentation Material Requisition To Resource Division RTOR000133/2022-2023 23/AD 05/04/2023 Resource Division 1.38 0.00 0 0
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE - IV OF DIAMOND HARBOUR-I BLOCK WITHIN MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- , SM/14475 Augmentation Material Requisition To Resource Division RTOR000347/2023-2024 3211/AD 04/10/2023 Resource Division 0.21 0.00 0 0
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE - IV OF DIAMOND HARBOUR-I BLOCK WITHIN MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- , SM/14475 Augmentation Material Requisition To Resource Division RTOR000892/2023-2024 746/AD 03/02/2024 Resource Division 15.46 0.00 0 0
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE - IV OF DIAMOND HARBOUR-I BLOCK WITHIN MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- , SM/14475 Augmentation Material Requisition To Resource Division RTOR000913/2023-2024 1255/AD 02/03/2024 Resource Division 0.62 0.00 0 0
Total 325.32 48.33 14.86