Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 377.49 67.09 17.77  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF NARAYANTALA PIPED WATER SUPPLY SCHEME BLOCK BASANTI UNDER CANNING SUB DIVISION OF ALIPORE DIVISION PHE DTE. , SM/13756 Augmentation Surging of 1no. Big dia Tubewell of Narayantala W/S Scheme under JJM, Block - Basanti under Canning Sub-Division under Alipore Division P.H.Engg. Dte. (TW-2) Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/000415/2023-2024 774/CSD 02/08/2023 35 S.K.GOLUI 2.17 2.15 99.08 99
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF NARAYANTALA PIPED WATER SUPPLY SCHEME BLOCK BASANTI UNDER CANNING SUB DIVISION OF ALIPORE DIVISION PHE DTE. , SM/13756 Augmentation Restoration of pipe line damaged due to flood like situation occurred by breaking of rivers embankment at Choradakatia under Narayantala W/S Scheme of Basanti Block under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division ORD/001351/2020-2021 1259/CSD 21/12/2020 30 SURYA ENTERPRISE 4.80 4.73 98.54 100
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF NARAYANTALA PIPED WATER SUPPLY SCHEME BLOCK BASANTI UNDER CANNING SUB DIVISION OF ALIPORE DIVISION PHE DTE. , SM/13756 Augmentation Construction of OHR (200 cum.), Laying of Distribution System, Providing Functional Household Tap Connection etc. of Ground Water Based Augmentation Piped Water Supply Scheme for the Narayantala,Block - Basanti under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer,1 CSD ORD/001641/2022-2023 11378/AD 13/02/2023 300 DIPTI ENTERPRISE 319.00 60.21 18.87 40
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF NARAYANTALA PIPED WATER SUPPLY SCHEME BLOCK BASANTI UNDER CANNING SUB DIVISION OF ALIPORE DIVISION PHE DTE. , SM/13756 Augmentation Material Requisition To Resource Division RTOR000073/2023-2024 538/AD 25/01/2024 Resource Division 40.34 0.00 0 0
5 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF NARAYANTALA PIPED WATER SUPPLY SCHEME BLOCK BASANTI UNDER CANNING SUB DIVISION OF ALIPORE DIVISION PHE DTE. , SM/13756 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, for Augmentation of Narayantala water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Basanti] Assistant Engineer Junior Engineer ORD/000493/2022-2023 295/SMD 03/02/2023 90 SRI KRISHNA NIRMAN 11.18 0.00 0 0
Total 377.50 67.09 17.77