Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
17 440.75 111.87 25.38  
1 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections etc. at Lakshmipur W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (SM/11877) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division ORD/000198/2024-2025 2581/AD 19/06/2024 45 SHIBU BISWAS 38.17 0.00 0 0
2 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Laying distribution system, Rising Main, construction of 01 no. Pump House Functional Household Tap Connection (FHTC) to all households including O & M of distribution system, rising main, FHTC for 1 year after completion of FHTC works for Lakshmipur Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division ORD/000360/2023-2024 1561/AD 17/07/2023 90 SHIBU BISWAS 189.75 79.21 41.74 20
3 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 1st and 2nd Tubewell Site of Laxmipur W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division ORD/000362/2022-2023 4117/AD 18/08/2022 30 M/S NAIYA & MAITY 18.12 16.40 90.51 100
4 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Construction of Platform and Road Restoration for Lakshmipur W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (PART-II) (SM/11877) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division ORD/000462/2024-2025 3421/AD 21/08/2024 60 ANANTA KUMAR GIRI 67.99 0.00 0 0
5 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Assistant Engineer (HQ-I) under Alipore Division, PHE Dte. (for the period from 01.09.2022 to 28.02.2023) Assistant Engineer, Kakdwip Sub Division ORD/000469/2022-2023 316/HQ-I/AD 29/08/2022 180 FIROJA KHATUN 2.40 1.56 65 38
6 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Conducting route survey, design distribution network and preparation & submission of DPR for each of different new water supply scheme / each Augmentation water supply scheme ( LASKHMIPUR PWSS) including Functional Household Tap Connection (FHTC) for implementation of JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division ORD/000494/2022-2023 2493/AD 27/06/2022 45 LEMNISCATE 5.79 5.79 100 100
7 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Assistant Engineer (HQ-I) under Alipore Division, PHE Dte. (From 01.09.2023 to 29.02.2024) Assistant Engineer,HQ-I Junior Engineer-1 ORD/001043/2023-2024 155-/HQ-I/AD 31/08/2023 180 FIROJA KHATUN 2.40 1.11 46.25 20
8 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 1st Tubewell Site of Laxmipur W/S scheme, Block : Kakdwip under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division ORD/001159/2023-2024 3721/AD 03/11/2023 30 ANANDA CONSTRUCTION 9.63 4.79 49.74 88
9 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 2nd Tubewell Site of Laskhmipur W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (2nd Call) Assistant Engineer, Kakdwip Sub Division ORD/001724/2022-2023 11750/AD 21/02/2023 30 MODERN CONSTRUCTION (NEW) 19.30 0.00 0 20
10 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Assistant Engineer (HQ-I) under Alipore Division, PHE Dte. (for the period from 01.03.2023 to 31.08.2023). Assistant Engineer,HQ-I ORD/001836/2022-2023 551/HQ-I/AD 27/02/2023 180 FIROJA KHATUN 2.40 2.01 83.75 40
11 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Making and fixing of permanent display board at headwork site of Bhubannagar, Gobindarampur, Laxmipur, Madhusudanpur, Ramtanunagar, Shibkalinagar PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E.D. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_2, Kakdwip Sub Division ORD/002142/2023-2024 942/KSD 19/12/2023 5 BIMALENDU GIRI 0.94 0.00 0 100
12 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Assistant Engineer (HQ-I) under Alipore Division, PHE Dte. (From 01.03.2024 To 31.08.2024) Assistant Engineer,HQ-I Junior Engineer-1 ORD/002393/2023-2024 1195/AD 28/02/2024 180 FIROJA KHATUN 2.40 1.00 41.67 85
13 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Material Requisition To Resource Division RTOR000444/2023-2024 4711/AD 18/12/2023 Resource Division 25.60 0.00 0 0
14 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Material Requisition To Resource Division RTOR000586/2023-2024 85/AD 03/01/2024 Resource Division 1.49 0.00 0 0
15 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Material Requisition To Resource Division RTOR000809/2023-2024 654/AD 30/01/2024 Resource Division 13.01 0.00 0 0
16 SOUTH 24 PARAGANAS Kakdwip Alipore Division GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Material Requisition To Resource Division RTOR000993/2023-2024 1786/AD 27/03/2024 Resource Division 36.04 0.00 0 0
17 SOUTH 24 PARAGANAS Kakdwip S24 Pgns Mechanical GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/11877 New Payment for New Service connection of Laxmipur W/S Scheme PH-1 Application No:- 1007169430 Reference ID:- 106214425 BILL/00966/2024-2025 BP-2024-25-192 23/07/2024 WBSEDCL 5.32 0.00 0 null
Total 440.74 111.86 25.38