Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 1,247.8 504.46 40.43  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Mandirtala PWSS under JJM at Sagar Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_5, Kakdwip Sub Division ORD/000077/2023-2024 61/KSD 02/05/2023 4 GEOTECHNICAL ENGINEERS CONSORTIUM 0.49 0.49 100 0
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Allied works for pile and pile cap portion regarding the construction of 600 cum. capacity 20 mtr. staging height R.C.C. Over Head Reservoir as per departmental design, drawing and specification including R.C.C. Bored pile and pile cap upto pedestal at Mandirtala (Zone-I & II) W/S Scheme, South 24 Parganas, Sagar Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_5, Kakdwip Sub Division ORD/000278/2023-2024 1428/AD 13/07/2023 45 SUPRITI ENTERPRISE 80.97 0.00 0 10
3 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for each of different new water supply scheme / each Augmentation water supply scheme (MANDIRTALA PWSS) including Functional Household Tap Connection (FHTC) for implementation of JJM at Sagar Block under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division ORD/000477/2022-2023 31/AD 04/04/2022 45 VOYAGER 7.71 0.00 0 0
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Surging of 01 no. Tubewell for augmentation of Mandirtala W/S Scheme under JJM, Block - Sagar under Kakdwip Sub - Division under Alipore Division P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_5, Kakdwip Sub Division ORD/000524/2023-2024 351/KSD 09/08/2023 20 S.K.GOLUI 1.77 0.00 0 0
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Construction of 600 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) including design & drawing of pile foundation & pile cap after soil investigation along with Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including O & M for Augmentation of Mandirtala Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_5, Kakdwip Sub Division ORD/000781/2022-2023 6535/AD 11/11/2022 300 SUPRITI ENTERPRISE 821.10 503.97 61.38 69
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Material Requisition To Resource Division RTOR000050/2022-2023 3902/AD 12/08/2022 Resource Division 148.87 0.00 0 0
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Material Requisition To Resource Division RTOR000094/2022-2023 5588/AD 29/09/2022 Resource Division 14.31 0.00 0 0
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Material Requisition To Resource Division RTOR000283/2023-2024 3058/AD 28/09/2023 Resource Division 110.39 0.00 0 0
9 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Material Requisition To Resource Division RTOR000323/2023-2024 3138/AD 29/09/2023 Resource Division 0.30 0.00 0 0
10 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Material Requisition To Resource Division RTOR000683/2023-2024 453/AD 24/01/2024 Resource Division 1.44 0.00 0 0
11 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF MANDIRTALA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) [PHASE - B] , SM/10783 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories for Augmentation of Mandirtala water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Sagar] Assistant Engineer -I Junior Engineer ORD/000568/2022-2023 587/SMD 24/02/2023 90 M/S. S.S. ENTERPRISE 60.45 0.00 0 0
Total 1,247.80 504.46 40.43