Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 1,301.77 29.02 2.23  
1 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Extension of distribution system (Node no. AB-CD) of Ghatbakultala W/S scheme at Mathurapur - I Block for Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 parganas under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Raidighi sub division ORD/000043/2022-2023 35/RSD 19/04/2022 60 R.G. ENTERPRISE (I) 4.77 4.77 100 100
2 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Remodeling of distribution system (Node No. 16-15-13-14, 16-17-18-19-20-21, 15-23-22-24) at Zone-XIII of Mathurapur - I Block for Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 parganas under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Raidighi sub division ORD/000108/2022-2023 05/RSD 04/04/2022 60 KAKALI ENTERPRISE 4.79 4.79 100 100
3 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Supply and delivery different dia of C.I.D.F. Sluice valve for different zone of Mathurapur I and II Block of Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 Parganas in connection with Jal Jeevan Mission (JJM) of Raidighi Sub-Division under Alipore Division, P.H.E. Dte. Assistant Engineer, Raidighi sub division Junior Engineer 3, Raidghi Sub Division ORD/000113/2023-2024 198/AD 19/04/2023 15 SSPR VALVE MANUFACTURING PVT. LTD 22.66 2.32 10.24 100
4 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Bamboo pilling walling at Zone-X of Mathurapur - I Block for ¿Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 parganas¿ under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. (Node point -255 - 255A, 255-255E, 255-255D, 255-255C) Assistant Engineer, Raidighi sub division ORD/000267/2022-2023 103/RSD 13/06/2022 60 SUPRITI ENTERPRISE 4.65 4.65 100 100
5 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Construction of thrust block for D.I. pipe line at Zone - I, Mathurapur - I Block for Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 parganas under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Raidighi sub division ORD/000426/2022-2023 282/RSD 01/09/2022 60 M/S KUNDU CONSTRUCTION 0.81 0.39 48.15 100
6 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Construction of 1500 cum capacity 20 M. staging height R.C.C. Over Head Water Reservoir, Providing FHTC including distribution system and other allied works at Zone- I of Mathurapur -I Block for ¿Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 parganas¿ in connection with Jal Jeevan Mission (JJM) under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Raidighi sub division Junior Engineer 2, Raidghi Sub Division,Junior Engineer-1, South 24 WS Circle. ORD/000576/2023-2024 2262/AD 14/08/2023 300 M/S. S.S. ENTERPRISE 1,185.63 0.00 0 5
7 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Special repairing work of pipeline and allied works to mitigate water supply problem at Rajapur & adjacent area Uttar Durgapur water supply scheme ( Zone-I of Mathurapur-I Block) under Mega surface water based water supply scheme-Falta Mathurapur, Dist. ¿ South 24 Parganas under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Raidighi sub division ORD/000634/2022-2023 95/RSD 07/06/2022 30 R.G. ENTERPRISE (I) 4.75 4.52 95.16 100
8 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Dismantling and restoration of concrete village road for laying pipe line work at Zone-I (Nodal point 354-356-357-359-361-363-367) of Mathurapur - I Block for Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 parganas under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Raidighi sub division ORD/001133/2022-2023 598/RSD 23/12/2022 30 RAIS ALI MOLLA 1.82 1.80 98.9 100
9 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Construction of culvert at Zone-I of Mathurapur-I Block in connection with Jal Jeevan Mission (JJM) under Mega surface water based water supply scheme-Falta Mathurapur, Dist. South 24 Parganas under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Raidighi sub division ORD/001804/2022-2023 934/RSD 10/03/2023 30 SUKUMAR HALDAR 1.07 1.04 97.2 99
10 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Dismantling and restoration of concrete village road LDS work at zone-I of Mathurapur-I block for Mega surface water based water supply scheme for Falta Mathurapur under Raidighi Sub Division of Alipore Division, PHE Dte Assistant Engineer, Raidighi sub division ORD/001901/2018-2019 258/RSD 20/08/2018 MUKHERJEE CONSTRUCTION 4.74 4.74 100 0
11 SOUTH 24 PARAGANAS Alipore Division Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Material Requisition To Resource Division RTOR000637/2023-2024 241/AD 15/01/2024 Resource Division 52.95 0.00 0 0
12 SOUTH 24 PARAGANAS S24 Pgns Mechanical Augmentation of Distribution System of Zone-I, Mathurapur-I Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) under Mega Surface Water Based Water Supply Scheme for Falta-Math , SM/10218 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, Zone-I of Mega Surface (Phase-I) water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Mathurapur-I] Assistant Engineer Junior Engineer ORD/000559/2022-2023 573/SMD 22/02/2023 90 DEBJYOTI BASU 13.13 0.00 0 0
Total 1,301.77 29.01 2.23