Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 75.44 46.75 61.97  
1 SOUTH 24 PARAGANAS Alipore Division Sinking of 20 nos Mark-II hand pump tube wells to mitigate the acute water scarcity due to super cyclone YAAS. , SM/08986 Disaster Sinking of 05(Five) nos. 100mm x 50mm dia. having 4 nos. Strainer upto 300 mtr (Average) depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe including High Rise Platforms and Stairs with G.I hand railing at different locations within different G.P.areas under Canning-I Block (Hatpukuria G.P.-02 no, Taldi G.P.-01 no, Nikarighata G.P.-01, Gopalpur G.P.-01 no.) due to affected by super Cyclon- YAASH in the Dist. of South 24 Parganas under Alipore Division, PHE Dte.(PART-B) Assistant Engineer,HQ-I ORD/001388/2021-2022 6140/AD 21/02/2022 30 SELIM GAZI 13.65 3.25 23.81 0
2 SOUTH 24 PARAGANAS Alipore Division Sinking of 20 nos Mark-II hand pump tube wells to mitigate the acute water scarcity due to super cyclone YAAS. , SM/08986 Disaster Sinking of 05(Five) nos. 100mm x 50mm dia. having 4 nos. Strainer upto 330 mtr (Average) depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe including High Rise Platforms and Stairs with G.I hand railing at different locations within different G.P.areas under Namkhana Block (Haripur G.P.- 02 no,Narayanpur G.P.- 03) due to affected by super Cyclone-YAASH in the Dist. of South 24 Parganas under Alipore Division, PHE Dte.(PART-D) Assistant Engineer,HQ-I ORD/001407/2021-2022 6152/AD 21/02/2022 30 A.M. ENTERPRISE 15.93 15.79 99.12 0
3 SOUTH 24 PARAGANAS Alipore Division Sinking of 20 nos Mark-II hand pump tube wells to mitigate the acute water scarcity due to super cyclone YAAS. , SM/08986 Disaster Sinking of 09(Nine) nos. 100mm x 50mm dia. having 4 nos. Strainer upto 300 mtr (Average) depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe including High Rise Platforms and Stairs with G.I hand railing at different locations within different G.P.areas under Gosaba Block (Chotomollakhali G.P.- 03 no, Kachukhali G.P.- 05 no, Rangabelia G.P- 01 no) due to affected by super Cyclone-YAASH in the Dist. of South 24 Parganas under Alipore Division, PHE Dte.(PART-B) Assistant Engineer,HQ-I ORD/001413/2021-2022 6156/AD 21/02/2022 30 MD. NAZRUL ISLAM GAZI 30.43 12.35 40.58 0
4 SOUTH 24 PARAGANAS Alipore Division Sinking of 20 nos Mark-II hand pump tube wells to mitigate the acute water scarcity due to super cyclone YAAS. , SM/08986 Disaster Sinking of 05(Five) nos. 100mm x 50mm dia. having 4 nos. Strainer upto 350 mtr (Average) depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe including High Rise Platforms and Stairs with G.I hand railing at different locations within different G.P.areas under Joynagar-I Block (Khakurdha G.P.-03 no, Jangaliya G.P.- 02 no,) due to affected by super Cyclon- "YAASH" in the Dist. of South 24 Parganas under Alipore Division, PHE Dte. [PART-C] Assistant Engineer,HQ-I ORD/001527/2021-2022 6274/AD 24/02/2022 30 M/S. L.P. CONSTRUCTION 15.43 15.36 99.55 0
Total 75.45 46.76 61.97