Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 691.08 5.18 0.75  
1 SOUTH 24 PARAGANAS Alipore Division Retrofitting for Providing FHTC at Ground Water Based Naraharipur & Its Adj Mouza Water Supply Scheme, Block : Sagar, District- South 24 Pgs. (Phase-A) , SM/08810 Retrofitting Route Survey for Providing FHTC at Naraharipur W/S Scheme & it's adjacent areas, Block Sagar under Kakdwip Sub - Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division ORD/001084/2021-2022 575/KSD 01/09/2021 20 LEMNISCATE 4.24 4.57 107.78 100
2 SOUTH 24 PARAGANAS Alipore Division Retrofitting for Providing FHTC at Ground Water Based Naraharipur & Its Adj Mouza Water Supply Scheme, Block : Sagar, District- South 24 Pgs. (Phase-A) , SM/08810 Retrofitting Construction of 250 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) including design & drawing of pile foundation & pile cap after soil investigation along with Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including O & M for Augmentation of Naraharipur Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/001171/2023-2024 3815/AD 07/11/2023 300 ALOK ENTERPRISE (A UNIT OF SAKET TREXIM PVT. LTD.) 668.32 0.00 0 35
3 SOUTH 24 PARAGANAS Alipore Division Retrofitting for Providing FHTC at Ground Water Based Naraharipur & Its Adj Mouza Water Supply Scheme, Block : Sagar, District- South 24 Pgs. (Phase-A) , SM/08810 Retrofitting Route Survey for Providing FHTC at Naraharipur W/S Scheme & it's adjacent areas, Block Sagar under Kakdwip Sub - Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division ORD/001608/2021-2022 606/KSD 27/09/2021 7 LEMNISCATE 1.55 0.61 39.35 100
4 SOUTH 24 PARAGANAS Alipore Division Retrofitting for Providing FHTC at Ground Water Based Naraharipur & Its Adj Mouza Water Supply Scheme, Block : Sagar, District- South 24 Pgs. (Phase-A) , SM/08810 Retrofitting Material Requisition To Resource Division RTOR000327/2023-2024 3142/AD 29/09/2023 Resource Division 0.30 0.00 0 0
5 SOUTH 24 PARAGANAS Alipore Division Retrofitting for Providing FHTC at Ground Water Based Naraharipur & Its Adj Mouza Water Supply Scheme, Block : Sagar, District- South 24 Pgs. (Phase-A) , SM/08810 Retrofitting Material Requisition To Resource Division RTOR000535/2023-2024 19/AD 02/01/2024 Resource Division 16.67 0.00 0 0
Total 691.08 5.17 0.75