Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 239.46 5.03 2.1  
1 SOUTH 24 PARAGANAS Alipore Division Retrofitting of ground water based Kanthalberia Water Supply Scheme to accommodate FHTC in Basanti Block of South 24 Parganas District under Alipore Division, PHE Dte. , SM/08806 Retrofitting Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell (New) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter for retrofitting of Kanthalberia W/S Scheme, Block - Basanti under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000815/2022-2023 6810/AD 16/11/2022 30 HARIDAS DUTTA 19.49 0.00 0 95
2 SOUTH 24 PARAGANAS Alipore Division Retrofitting of ground water based Kanthalberia Water Supply Scheme to accommodate FHTC in Basanti Block of South 24 Parganas District under Alipore Division, PHE Dte. , SM/08806 Retrofitting Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site for Retrofitting of Kanthalberia W/S Scheme, Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000818/2022-2023 6813/AD 16/11/2022 30 M/S BHUNIA ENTERPRISE 7.18 0.00 0 0
3 SOUTH 24 PARAGANAS Alipore Division Retrofitting of ground water based Kanthalberia Water Supply Scheme to accommodate FHTC in Basanti Block of South 24 Parganas District under Alipore Division, PHE Dte. , SM/08806 Retrofitting Survey work for Augmentation of ground water based Kanthalberia Water Supply Scheme to accommodate FHTC in Basanti Block of South 24 Parganas District under Alipore Division, PHE Dte. Part-I Assistant Engineer, Canning sub division ORD/001840/2021-2022 679CSD 18/08/2021 15 HORIZEN 1.99 1.84 92.46 100
4 SOUTH 24 PARAGANAS Alipore Division Retrofitting of ground water based Kanthalberia Water Supply Scheme to accommodate FHTC in Basanti Block of South 24 Parganas District under Alipore Division, PHE Dte. , SM/08806 Retrofitting Design and DPR preparation for Augmentation of ground water based Kanthalberia Water Supply Scheme to accommodate FHTC in Basanti Block of South 24 Parganas District under Alipore Division, PHE Dte. Part-II Assistant Engineer, Canning sub division ORD/001841/2021-2022 680/CSD 18/08/2021 15 HORIZEN 3.19 3.19 100 100
5 SOUTH 24 PARAGANAS Alipore Division Retrofitting of ground water based Kanthalberia Water Supply Scheme to accommodate FHTC in Basanti Block of South 24 Parganas District under Alipore Division, PHE Dte. , SM/08806 Retrofitting Material Requisition To Resource Division RTOR000037/2021-2022 7033/AD 31/03/2022 Resource Division 194.40 0.00 0 0
6 SOUTH 24 PARAGANAS Alipore Division Retrofitting of ground water based Kanthalberia Water Supply Scheme to accommodate FHTC in Basanti Block of South 24 Parganas District under Alipore Division, PHE Dte. , SM/08806 Retrofitting Material Requisition To Resource Division RTOR000391/2023-2024 332/AD 19/01/2024 Resource Division 13.21 0.00 0 0
Total 239.45 5.03 2.1