Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 105.03 16.83 16.02  
1 HOWRAH Howrah Division Source Augmentation of Balichak Water Supply Scheme , SM/18885 Augmentation Additional construction of 1nos switch room (5.4x 3.6) at 4th TW site and laying distribution pipeline with FHTC at Balichack PWSS SM/18885 of Amta-I Block in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. AE/Ulu ORD/000056/2024-2025 2858/HD 24/06/2024 30 RANI CONSTRUCTION 6.28 0.00 0 0
2 HOWRAH Howrah Division Source Augmentation of Balichak Water Supply Scheme , SM/18885 Augmentation Additional laying distribution pipeline with FHTC at Balichack PWSS SM/18885 of Amta-I Block in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. AE/Ulu ORD/000074/2024-2025 3164/HD 12/07/2024 60 RANA ENTERPRISE 34.95 0.00 0 0
3 HOWRAH Howrah Division Source Augmentation of Balichak Water Supply Scheme , SM/18885 Augmentation Additional construction of 1nos switch room (5.4x 3.6) at 5th TW site and laying distribution pipeline with FHTC at Balichack PWSS SM/18885 of Amta-I Block in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. AE/Ulu ORD/000075/2024-2025 3165/HD 12/07/2024 30 ARUSHI CONSTRUCTION 6.28 0.00 0 0
4 HOWRAH Howrah Division Source Augmentation of Balichak Water Supply Scheme , SM/18885 Augmentation Additional Sinking of 2 (Two) Nos. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Balichack PWSS SM/18885 of Amta-I Block in Uluberia Sub-Division, under Howrah Division P.H.E. Dte. AE/Ulu JE/USD ORD/000666/2023-2024 1305/HD 14/03/2024 60 ACME CONSTRUCTION 29.98 16.83 56.14 100
5 HOWRAH Electrical Source Augmentation of Balichak Water Supply Scheme , SM/18885 Augmentation Quotation money deposition for new service connection at Balichak w/s scheme, T.W. No.-V, Dist.-Howrah under PHE Dte. Application No- 1007772492 Reference ID- 106595796 SM Code- 18885 BILL/00491/2024-2025 164 28/05/2024 WBSEDCL 5.63 0.00 0 null
6 HOWRAH Electrical Source Augmentation of Balichak Water Supply Scheme , SM/18885 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Source Augmentation of Balichak Water Supply Scheme Block- Amta-I District- Howrah under JJM Program under Electrical Division PHE Dte. ORD/001300/2023-2024 4533/ED 23/11/2023 90 GHOSE ENGINEERING SYNDICATE 21.91 0.00 0 0
Total 105.03 16.83 16.03