Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 76.45 0.8 1.05  
1 HOWRAH Howrah Division Source Augmentation of Sarda Water Supply Scheme , SM/18884 Augmentation Additional laying distribution pipeline with FHTC at Sarda PWSS SM/18884 of Amta-II Block in Uluberia Sub-Division, under Howrah Division P.H.E. Dte. AE/Ulu ORD/000045/2024-2025 2901/HD 26/06/2024 75 S.S. ENTERPRISE 43.21 0.00 0 0
2 HOWRAH Howrah Division Source Augmentation of Sarda Water Supply Scheme , SM/18884 Augmentation Additional construction of 1nos switch room (5.4x 3.6) at TW site at Sarda PWSS SM/18884 of Amta-II Block in Uluberia Sub Division, under Howrah Division, P.H.E. Dte. AE/Ulu ORD/000057/2024-2025 2911/HD 26/06/2024 30 RANI CONSTRUCTION 6.28 0.00 0 0
3 HOWRAH Howrah Division Source Augmentation of Sarda Water Supply Scheme , SM/18884 Augmentation Sinking of 1 (One) Nos. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Sarda PWSS SM/18884 of Amta-II Block in Uluberia Sub-Division, under Howrah Division P.H.E. Dte. AE/Ulu JE/BLK/amta2 ORD/000669/2023-2024 1308/HD 14/03/2024 30 WESTERN WATER SUPPLY AGENCY 14.64 0.00 0 0
4 HOWRAH Howrah Division Source Augmentation of Sarda Water Supply Scheme , SM/18884 Augmentation Preparation of DPR for Source Strengthning at Sarda PWSS, Amta-II Block under Uluberia Sub-Division of Howrah Division PHE Dte. AE/Ulu JE-USD,JE/USD ORD/000682/2023-2024 517/AE/USD 05/10/2023 30 APEX TECHNOLOGIES 0.78 0.00 0 0
5 HOWRAH Electrical Source Augmentation of Sarda Water Supply Scheme , SM/18884 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Source Augmentation of Sarda Water Supply Scheme Block- Amta-II District- Howrah under JJM Program under Electrical Division PHE Dte. ORD/001299/2023-2024 4532/ED 23/11/2023 90 S.B.ENTERPRISE 10.74 0.00 0 0
6 HOWRAH Electrical Source Augmentation of Sarda Water Supply Scheme , SM/18884 Augmentation Supply delivery and installation of Chlorinator for Sarda w/s scheme PH No. IV District Howrah under Electrical Division, PHE dte. ORD/002568/2022-2023 721/HMSD 23/03/2023 7 TRIO CONCERN 0.80 0.80 100 100
Total 76.45 0.80 1.05