Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 503.79 60.66 12.04  
1 HOWRAH Howrah Division Source Augmentation of Bikihakola Water Supply Scheme , SM/18846 Augmentation Retrofitting work for providing Functional Household Tap Connection (FHTC) from existing distributin system of Bikihakola piped water supply scheme under Panchla Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. (Phase-II) AE/SADAR ORD/000492/2020-2021 399/HD 10/02/2021 30 M/S ASHIRBAD (INDIA) 92.07 33.36 36.23 100
2 HOWRAH Howrah Division Source Augmentation of Bikihakola Water Supply Scheme , SM/18846 Augmentation Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distributin system of Bikiha kola piped water supply scheme under Panchla Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. (Phase-IV) AE/SADAR ORD/000495/2020-2021 425/HD 11/02/2021 30 G.B. CONSTRUCTION AND CO 92.50 17.93 19.38 100
3 HOWRAH Howrah Division Source Augmentation of Bikihakola Water Supply Scheme , SM/18846 Augmentation Work Order for Survey & Collection of house hold details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system in Bikihakola Piped Water Supply Scheme under Howrah District. (Part-C) AE/SADAR ORD/000519/2021-2022 508/HD 08/03/2022 15 G.B. CONSTRUCTION AND CO 0.68 0.68 100 100
4 HOWRAH Howrah Division Source Augmentation of Bikihakola Water Supply Scheme , SM/18846 Augmentation Work Order for Retrofitting work for Functional Household Tap Connection(FHTC) from existing distribution system of Bikihakola PWSS under Panchla Block of Howrah Sadar Sub Division under Howrah Division, PHE Dte.(Phase-II) (Part-A) No of House Hold= 100 nos. AE/SADAR ORD/000545/2021-2022 661/HD 23/03/2022 20 UNIQUE CONSTRUCTION 3.82 0.37 9.69 100
5 HOWRAH Howrah Division Source Augmentation of Bikihakola Water Supply Scheme , SM/18846 Augmentation Work Order for Retrofitting work for Functional Household Tap Connection(FHTC) from existing distribution system of Bikihakola PWSS under Panchla Block of Howrah Sadar Sub Division under Howrah Division, PHE Dte.(Phase-II) (Part-B)No of House Hold= 100 nos. AE/SADAR ORD/000546/2021-2022 662/HD 23/03/2022 20 UNIQUE CONSTRUCTION 3.67 2.61 71.12 100
6 HOWRAH Howrah Division Source Augmentation of Bikihakola Water Supply Scheme , SM/18846 Augmentation Sinking of 1 (One) Nos. 250 X 150 mm Dia and 240 m deep tubewell Drilling by Direct Rotary method, Construction of 1 (One) Nos.Pump House (5.40m x 3.60 m), Construction of 1(One) nos. Boundary Wall,Construction of Boundary Wall at Head work Site of Size-(50.00 m x 40.00 m), Construction of 700 cum Capacity, 20mtr. Staging Height RCC Elevated Reservoir As Per Departmental Type Design (Ref : Dept. Super Struc. DRG. No. PC-I/OHR/8/2012) including Soil Investigation, Foundation Design & All pipe Connection and Reconnection of FHTC & distribution pipe line and Allied Works at Bikiakhola PWSS at Panchla Block of Howrah District under Howrah Sadar Sub-Division of Howrah Division, P. H. E. Dte. AE/SADAR ORD/000552/2023-2024 879/HD 23/02/2024 180 THE UNICON ENGINEERS 289.03 0.00 0 0
7 HOWRAH Howrah Division Source Augmentation of Bikihakola Water Supply Scheme , SM/18846 Augmentation Work Order Retrofitting work of Laying Pipeline From Node Point 4-162, 162-220 for Bikihakola PWSS at Panchla Block of Howrah Sadar Sub Division under Howrah Division, P. H. E. Dte. AE/SADAR ORD/000596/2022-2023 2606/HD 07/12/2022 45 UNIVERSAL CORPORATION 11.28 5.71 50.62 40
8 HOWRAH Electrical Source Augmentation of Bikihakola Water Supply Scheme , SM/18846 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Source Augmentation of Bikihakola Water Supply Scheme Block- Panchla District- Howrah under JJM Program under Electrical Division PHE Dte. ORD/001305/2023-2024 4538/ED 23/11/2023 90 D. K. ELECTRIC 10.74 0.00 0 0
Total 503.81 60.66 12.04