Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 103.22 0.65 0.63  
1 HOWRAH Howrah Division Source Augmentation of Sahapur Piped Water Supply Scheme , SM/18844 Augmentation Design,drawing, construction including rcc foundation and commissioning of iron elimination plant of capacity 50.00 cum per hours including 3(three) month trial run in the premises, construction of 3.60m X 3.00m size Blower room of compressure for IEP, at Sahapur PWSS Under Howrah Sadar Sub-Division of Howrah division P.H.E Dte. AE/SADAR ORD/000050/2024-2025 2890/HD 25/06/2024 45 NEER UDYOG 24.38 0.00 0 0
2 HOWRAH Howrah Division Source Augmentation of Sahapur Piped Water Supply Scheme , SM/18844 Augmentation Work Order for Retrofitting work for providing Functional Household Tap Connection(FHTC) including school, anganwari & other establishments like temple, mosque, govt. premises, mela ground, public toilets etc. from existing distributin system of Sahapur piped water supply scheme under Panchla Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. (Phase-IV) AE/SADAR ORD/000423/2021-2022 337/HD 17/02/2022 30 UNIVERSAL CONSTRUCTION 2.98 0.65 21.81 100
3 HOWRAH Howrah Division Source Augmentation of Sahapur Piped Water Supply Scheme , SM/18844 Augmentation Sinking 1No. 250 X 150 mm Dia and 240 m deep tube well drilling by direct rotary method with 150 mm. dia. PVC. strainer of 30m. length having 250 mm dia. 60m. long PVC housing pipe & 150 mm dia. 150m. long well pipe alongwith 3m blank pipe all complete including cost of materials at Sahapur PWSS at Panchla Block of Howrah District under Howrah Sadar Sub-Division of Howrah Division, P.H.E. Dte. AE/SADAR ORD/000591/2023-2024 1009/HD 01/03/2024 30 AUXILIARY TUBEWELL DRILLERS 14.59 0.00 0 0
4 HOWRAH Howrah Division Source Augmentation of Sahapur Piped Water Supply Scheme , SM/18844 Augmentation Connection with distribution system and reconnection of FHTC & allied works, construction of 1 (One) no.pump house (5.40m x 3.60m),construction of 1 (One) no. boundary wall at Sahapur piped water supply scheme under Howrah Sadar Sub-Division of Howrah Division, P.H.E. Dte. AE/SADAR ORD/000602/2023-2024 1067/HD 04/03/2024 60 ADITYA HAZRA 50.59 0.00 0 0
5 HOWRAH Electrical Source Augmentation of Sahapur Piped Water Supply Scheme , SM/18844 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Source Augmentation of Sahapur Piped Water Supply Scheme Block- Panchla District- Howrah under JJM Program under Electrical Division PHE Dte. ORD/001303/2023-2024 4536/ED 23/11/2023 90 MUKHERJEE ART CENTRE 10.68 0.00 0 0
Total 103.22 0.65 0.63