Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 981.85 190.83 19.44  
1 HOWRAH Howrah Division Augmentation of Ground Water Based Udang(Zone-I & II) Piped Water Supply Scheme , SM/18567 Augmentation Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) & Interconnection between tube wells, construction of 2 nos 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 1000mm) with Sanitary and water Supply arrangement at TW Sites and 450 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection & soil investigation including pile design for UDANG (ZONE-II) PWSS OF AMTA-I BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. AE/Ulu JE/USD ORD/000145/2023-2024 2839/HD 07/08/2023 120 NATURAL RESOURCES CONSORTIUM 501.82 25.35 5.05 0
2 HOWRAH Howrah Division Augmentation of Ground Water Based Udang(Zone-I & II) Piped Water Supply Scheme , SM/18567 Augmentation Laying Distribution System(HDPE & DI) & Providing Functional Household Tap Connection (FHTC) & Interconnection between tube wells UDONG (ZONE-I) PWSS OF AMTA-I BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. AE/Ulu JE/USD ORD/000159/2023-2024 2977/HD 17/08/2023 120 TAPU SAHA 410.47 151.22 36.84 59
3 HOWRAH Howrah Division Augmentation of Ground Water Based Udang(Zone-I & II) Piped Water Supply Scheme , SM/18567 Augmentation Sinking of 3(Three) No. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Udang Zone-I & Zone-II 2 nos under Amta-I Block of Uluberia Sub-Division under Howrah Division, P. H. E. Dte. AE/Ulu JE/USD ORD/000191/2023-2024 3133/HD 29/08/2023 45 NADIA TUBEWELLS 38.94 12.34 31.69 68
4 HOWRAH Howrah Division Augmentation of Ground Water Based Udang(Zone-I & II) Piped Water Supply Scheme , SM/18567 Augmentation Work for Preparation of DPR for Augmentation of Udong PWSS, Amta-I Block under Uluberia Sub-Division of Howrah Division PHE Dte. AE/Ulu JE/USD ORD/000219/2022-2023 314/AE/USD 16/08/2022 45 MS SOBHA AND CO 3.83 1.92 50.13 100
5 HOWRAH Electrical Augmentation of Ground Water Based Udang(Zone-I & II) Piped Water Supply Scheme , SM/18567 Augmentation Quotation money deposition for new service connection at Udang w/s scheme, Zone- I, T.W. No.-IV, Dist.-Howrah under PHE Dte. Application No- 1007772514 Reference ID- 106595797 SM Code- 18567 BILL/00492/2024-2025 165 28/05/2024 WBSEDCL 5.30 0.00 0 null
6 HOWRAH Electrical Augmentation of Ground Water Based Udang(Zone-I & II) Piped Water Supply Scheme , SM/18567 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Udang water supply scheme, T.W. No. I & II, Block: Amta-I, District- Howrah under Electrical Division, PHE Dte. ORD/000923/2023-2024 3594/ED 28/08/2023 90 EMCON 21.49 0.00 0 0
Total 981.86 190.82 19.43