Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 878.32 36.65 4.17  
1 HOWRAH Howrah Division Augmentation of Ground Water Based Harop (Zone-I & II) Piped Water Supply Scheme , SM/18565 Augmentation Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) & Interconnection between tube wells HAROP (ZONE-I) PWSS OF BAGNAN-I BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. AE/Ulu je/blk/bagn1 ORD/000142/2023-2024 2837/HD 07/08/2023 120 N. G ENGINEERING 249.55 22.34 8.95 0
2 HOWRAH Howrah Division Augmentation of Ground Water Based Harop (Zone-I & II) Piped Water Supply Scheme , SM/18565 Augmentation Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) & Interconnection between tube wells & Construction of 4 nos 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 1000mm) with Sanitary and water Supply arrangement and 400 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection & soil investigation including pile design of HAROP (ZONE-II) PWSS OF BAGNAN-I BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. AE/Ulu je/blk/bagn1 ORD/000147/2023-2024 2846/HD 07/08/2023 365 SUBHASH BOSE 506.25 0.00 0 0
3 HOWRAH Howrah Division Augmentation of Ground Water Based Harop (Zone-I & II) Piped Water Supply Scheme , SM/18565 Augmentation Preparation of DPR for Augmentation of Harop PWSS, Bagnan-I Block under Uluberia Sub-Division of Howrah Division PHE Dte. AE/Ulu je/blk/bagn1 ORD/000223/2022-2023 316/AE/USD 16/08/2022 45 MS SOBHA AND CO 3.48 1.72 49.43 90
4 HOWRAH Howrah Division Augmentation of Ground Water Based Harop (Zone-I & II) Piped Water Supply Scheme , SM/18565 Augmentation Sinking of 5 (Five) No. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Harop PWSS Zone -I (1 no) & Zone-II (2 nos) & Matinala PWSS (2 nos) of Bagnan-I Block of Uluberia Sub-Division under Howrah Division, P.H.E. Dte. AE/Ulu JE-USD,je/blk/bagn1,JE/USD ORD/000249/2023-2024 3533/HD 04/10/2023 60 AQUATECH ENGINEERS 64.95 12.59 19.38 40
5 HOWRAH Howrah Division Augmentation of Ground Water Based Harop (Zone-I & II) Piped Water Supply Scheme , SM/18565 Augmentation Material Requisition To Resource Division RTOR000088/2023-2024 170/HD 15/01/2024 Resource Division 11.40 0.00 0 0
6 HOWRAH Electrical Augmentation of Ground Water Based Harop (Zone-I & II) Piped Water Supply Scheme , SM/18565 Augmentation Quotation for new service connection of Harop W/S. Sch. PH-II BILL/06046/2023-2024 746 08/02/2024 WBSEDCL 6.37 0.00 0 0
7 HOWRAH Electrical Augmentation of Ground Water Based Harop (Zone-I & II) Piped Water Supply Scheme , SM/18565 Augmentation Quotation for new service connection of Harop W/S. Sch. PH-I BILL/06053/2023-2024 753 16/02/2024 WBSEDCL 4.08 0.00 0 0
8 HOWRAH Electrical Augmentation of Ground Water Based Harop (Zone-I & II) Piped Water Supply Scheme , SM/18565 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Harop (Zone-I & II) water supply scheme, T.W. No. I, II & III, Block: Bagnan-I, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000922/2023-2024 3593/ED 28/08/2023 90 SUBHRA ENTERPRISE 32.24 0.00 0 0
Total 878.31 36.66 4.17