Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 576.15 112.48 19.52  
1 HOWRAH Udaynarayanpur Howrah Division Sibpur Piped Water Supply Scheme. , SM/13769 New Work Order for Sinking of 2nos 250 X 150mm dia Tube Well 230 mtr,Construction of 2nos Pump House cum switch room with sanitary arrangement, Laying Distribution system (LDS) with necessaery inter-connections with OHR and bypass arrangemnet etc. all complete, Functional Household Tap Connection (FHTC) works, Construction of 200 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (Drawing No-PC-I/O.H.R/9/2012) with necessary soil investigation with foundation design as per soil test report For SIBPUR PWSS at Udaynarayanpur Block under uluberia Sub Division under Howrah Division, P. H. E. Dte. AE/RWS JE/RWS/Udaynaryanpur,JE Sadar ORD/000020/2023-2024 1652/HD 18/04/2023 365 SANJOY GHOSH 328.49 99.49 30.29 55
2 HOWRAH Udaynarayanpur Howrah Division Sibpur Piped Water Supply Scheme. , SM/13769 New Construction of Boundary Wall, Construction of Approach Road and Land Development at HEAD WORK Site and 2nd Tube Well Site of SHIBPUR Piped Water Supply Scheme at Udaynarayanpur Block Under Howrah Division, P.H.E. Dte. AE/RWS ORD/000044/2024-2025 2888/HD 25/06/2024 60 SANJOY GHOSH 62.98 0.00 0 0
3 HOWRAH Udaynarayanpur Howrah Division Sibpur Piped Water Supply Scheme. , SM/13769 New Rising Main & Inter Connection with both tube wells of SIBPUR PWSS in Udaynarayanpur Block under Howrah Division, PHE Dte. AE/RWS ORD/000076/2024-2025 3166/HD 12/07/2024 30 TIYASA ENTERPRISE 5.17 0.00 0 0
4 HOWRAH Udaynarayanpur Howrah Division Sibpur Piped Water Supply Scheme. , SM/13769 New Work Order for Preparation of DPR for new piped water supply scheme of Sibpur PWSS, Udaynarayanpur Block under Uluberia Sub-Division of Howrah Division PHE Dte. AE/Ulu ORD/000451/2021-2022 252/HD 07/02/2022 15 APEX ENGINEERING 2.70 2.70 100 100
5 HOWRAH Udaynarayanpur Howrah Division Sibpur Piped Water Supply Scheme. , SM/13769 New Material Requisition To Resource Division RTOR000050/2023-2024 3217/HD 05/09/2023 Resource Division 14.70 0.00 0 0
6 HOWRAH Udaynarayanpur Howrah Division Sibpur Piped Water Supply Scheme. , SM/13769 New Material Requisition To Resource Division RTOR000109/2023-2024 1049/HD 04/03/2024 Resource Division 0.83 0.00 0 0
7 HOWRAH Udaynarayanpur Electrical Sibpur Piped Water Supply Scheme. , SM/13769 New Adhoc Payment to WBSEDCL against service Connection BILL/01126/2023-2024 null 28/06/2023 WBSEDCL 117.51 0.00 0 0
8 HOWRAH Udaynarayanpur Electrical Sibpur Piped Water Supply Scheme. , SM/13769 New Quotation bill for new service connection charge for Shibpur PWSS TW - I BILL/04436/2023-2024 496 07/12/2023 WBSEDCL 12.30 0.00 0 0
9 HOWRAH Udaynarayanpur Electrical Sibpur Piped Water Supply Scheme. , SM/13769 New Quotation Bill for New Service Connection at Sibpur W/S. Sch. PH-II BILL/04438/2023-2024 511 08/12/2023 WBSEDCL 10.12 0.00 0 0
10 HOWRAH Udaynarayanpur Electrical Sibpur Piped Water Supply Scheme. , SM/13769 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Sibpur water supply scheme, T.W. No.- I & II, Block: Udaynarayanpur, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000258/2022-2023 925/ED 22/02/2023 90 ESENCE ENGINEERING CONCERN 21.35 10.29 48.2 90
Total 576.15 112.48 19.52