Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
11 | 652.58 | 48.27 | 7.4 | ||||||||||||||
1 | HOWRAH | Uluberia - II | Howrah Division | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Work Order for Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) & Construction of 300 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir (Drawing No- PC I/O.H.R/7/2012)with necessary soil investigation with foundation design as per soil test report for Barramnagar Piped Water Supply Scheme in Uluberia-II Block under Uluberia Sub-Division under Howrah Division, P. H. E. Dte. | AE/Ulu | JE/USD | ORD/000026/2023-2024 | 1691/HD | 20/04/2023 | 365 | PRADIP KUMAR JATI | 316.16 | 27.84 | 8.81 | 38 |
2 | HOWRAH | Uluberia - II | Howrah Division | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Construction of 2nos switch room (5.4x 3.6) at HW & 2nd TW site and boundary wall at HW Site and Interconnection between TW's of Barramnagar PWSS under Uluberia-II Block in Uluberia Sub-Division, under Howrah Division P.H.E. Dte. | AE/Ulu | JE/USD | ORD/000318/2023-2024 | 4397/HD | 06/12/2023 | 60 | A. R. CONSTRUCTION | 39.66 | 12.63 | 31.85 | 75 |
3 | HOWRAH | Uluberia - II | Howrah Division | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Preparation of DPR for Barram Nagar PWSS, Uluberia-II Block under Uluberia Sub-division of Howrah Division P.H.E Dte. | AE/Ulu | ORD/000362/2022-2023 | 457/AE/USD | 15/09/2022 | 45 | APEX ENGINEERING | 3.29 | 2.88 | 87.54 | 100 | |
4 | HOWRAH | Uluberia - II | Howrah Division | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Work Order for Sinking of 7 (Seven) Nos. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Augmentation of Bamunhati PWSS (3 nos) & Kamina PWSS (2 nos) & Barramnagar PWSS (2 nos) of Uluberia - II Block of Uluberia Sub-Division under Howrah Division, P. H. E. Dte. | AE/Ulu | ORD/000881/2022-2023 | 1195/HD | 23/03/2023 | 60 | ACME CONSTRUCTION | 90.87 | 0.00 | 0 | 30 | |
5 | HOWRAH | Uluberia - II | Howrah Division | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Material Requisition To Resource Division | RTOR000028/2023-2024 | 1754/HD | 26/04/2023 | Resource Division | 21.56 | 0.00 | 0 | 0 | |||
6 | HOWRAH | Uluberia - II | Howrah Division | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Material Requisition To Resource Division | RTOR000060/2023-2024 | 4695/HD | 26/12/2023 | Resource Division | 12.29 | 0.00 | 0 | 0 | |||
7 | HOWRAH | Uluberia - II | Howrah Division | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Material Requisition To Resource Division | RTOR000095/2023-2024 | 170/HD | 15/01/2024 | Resource Division | 3.14 | 0.00 | 0 | 0 | |||
8 | HOWRAH | Uluberia - II | Electrical | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Adhoc payment to WBSEDCL against service connnection | BILL/01127/2023-2024 | null | 28/06/2023 | WBSEDCL | 109.23 | 0.00 | 0 | 0 | |||
9 | HOWRAH | Uluberia - II | Electrical | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Quotation Bill for New Service Connection at Barramnagar W/S. Sch. PH-I | BILL/05983/2023-2024 | 728 | 05/02/2024 | WBSEDCL | 8.74 | 0.00 | 0 | 0 | |||
10 | HOWRAH | Uluberia - II | Electrical | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Quotation money deposition for new service connection at Barramnagar pwss , P.H No.-II, Dist-Howrah under PHED. App. No.-1007576971 Ref.ID: 106502484 SM/13750 | BILL/06262/2023-2024 | 865 | 12/03/2024 | WBSEDCL | 27.26 | 0.00 | 0 | null | |||
11 | HOWRAH | Uluberia - II | Electrical | BARRAMNAGAR PIPED WATER SUPPLY SCHEME. , SM/13750 | New | Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Barramnagar water supply scheme, T.W. No.- I & II, Block: Uluberia-II, District- Howrah under Electrical Division, PHE Dte. | Assistant Engineer Howrah mechanical Sub Division | Junior Engineer5 | ORD/000122/2022-2023 | 3534/ED | 30/12/2022 | 90 | M/S S R ENTERPRISE | 20.38 | 4.92 | 24.14 | 60 |
Total | 652.58 | 48.27 | 7.4 |