Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Showing 1 to 13 of 13 entries
Sl No.District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrustedName of JE entrustedSystem Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 589.100 
Sl No.
District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted
Name of JE entrusted
System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13
589.1
0
0
 
Total
589.09
0.00
0
 
1 HOWRAH Bagnan - I Howrah Division Gopalpur Piped Water Supply Scheme , SM/13748 New Work Order for Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) & Interconnection between tube wells & 300 cu.m. capacity 20mtr staging height RCC Over Head Reservoir including Pipe connection & soil investigation including pile design & Construction of 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 1000mm) with Sanitary and water Supply arrangement at Head Work Site GOPALPUR PWSS OF BAGNAN-I BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. AE/Ulu JE/RWS/Bagnan I ORD/000063/2023-2024 1917/HD 08/05/2023 599 PRAVAT SARKAR 335.59 0.00 0 16
2 HOWRAH Bagnan - I Howrah Division Gopalpur Piped Water Supply Scheme , SM/13748 New Field level data validation of FHTC for error free database in different Pipe Water Supply Scheme under Amta-I, Amta-II, Bagnan-I, Bagnan-II, Shyampur-I and Shyampur-II Block in the District of Howrah under the jurisdiction of Howrah Division, PHE Dte. AE HQ je_blk_ballyjag_how ORD/000286/2024-2025 4815/HD 19/11/2024 90 TECH VISION 12.67 0.00 0 100
3 HOWRAH Bagnan - I Howrah Division Gopalpur Piped Water Supply Scheme , SM/13748 New Preparation of DPR for Gopalpur PWSS, Bagnan-I Block under Uluberia Sub-division of Howrah Division P.H.E Dte. AE/Ulu JE-USD ORD/000364/2022-2023 459/AE/USD 15/09/2022 45 DULAL MAJUMDER 3.14 0.00 0 100
4 HOWRAH Bagnan - I Howrah Division Gopalpur Piped Water Supply Scheme , SM/13748 New Wall writing IEC message along with logo picture etc. of multiple colour as will be supplied by the PHE Dte. On smooth durable wall surface preferably of Govt. premises boundary wall under Bagnan-I & II Block of Uluberia Sub-Division under Howrah Division PHE Dte. AE HQ je_blk_ballyjag_how ORD/000636/2023-2024 1206/HD 11/03/2024 15 KULTIKARI MOTHER TERESA SOCIAL WELLFARE SOCIETY 2.01 0.00 0 100
5 HOWRAH Bagnan - I Howrah Division Gopalpur Piped Water Supply Scheme , SM/13748 New Site clearence of HW site of Gopalpur & Patinan PWSS under Uluberia Sub Division under Howrah Division, PHE Dte. AE/Ulu JE/USD ORD/000693/2023-2024 3244/AE/USD 12/03/2024 30 S R TRADING CORPORATION 0.96 0.00 0 100
6 HOWRAH Bagnan - I Howrah Division Gopalpur Piped Water Supply Scheme , SM/13748 New Work Order for Sinking of 4 (Four) Nos. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Gopalpur PWSS 2nos & Patinan PWSS 2 Nos of Bagnan - I Block of Uluberia Sub-Division under Howrah Division, P. H. E. Dte. AE/Ulu ORD/000745/2022-2023 663/HD 17/02/2023 45 AQUATECH ENGINEER 52.06 0.00 0 100
7 HOWRAH Bagnan - I Howrah Division Gopalpur Piped Water Supply Scheme , SM/13748 New Material Requisition To Resource Division RTOR000019/2023-2024 1754/HD 26/04/2023 0 Resource Division 36.34 0.00 0 0
8 HOWRAH Bagnan - I Howrah Division Gopalpur Piped Water Supply Scheme , SM/13748 New Material Requisition To Resource Division RTOR000086/2023-2024 170/HD 15/01/2024 0 Resource Division 4.87 0.00 0 0
9 HOWRAH Bagnan - I Electrical Gopalpur Piped Water Supply Scheme , SM/13748 New Adhoc payment to WBSEDCL against service connnection BILL/01127/2023-2024 28/06/2023 0 WBSEDCL 109.23 0.00 0 0
10 HOWRAH Bagnan - I Electrical Gopalpur Piped Water Supply Scheme , SM/13748 New Quotation Bill for New Service Connection at Gopalpur W/S. Sch. TW-I BILL/04134/2023-2024 387 01/11/2023 0 WBSEDCL 4.27 0.00 0 0
11 HOWRAH Bagnan - I Electrical Gopalpur Piped Water Supply Scheme , SM/13748 New Quotation Bill for New Service Connection at Uttar Gpalpur W/S. Sch. PH-I BILL/04328/2023-2024 441 24/11/2023 0 WBSEDCL 3.46 0.00 0 0
12 HOWRAH Bagnan - I Electrical Gopalpur Piped Water Supply Scheme , SM/13748 New Quotation bill for service connection charges at Gopalpur w/s scheme, Zone-II, P.H. No.-II, Dist: Hooghly Application No.- 5004035005 Ref Id: 503576015 BILL/06263/2023-2024 864 12/03/2024 0 WBSEDCL 4.15 0.00 0 0
13 HOWRAH Bagnan - I Electrical Gopalpur Piped Water Supply Scheme , SM/13748 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Gopalpur water supply scheme, T.W. No.- I & II, Block: Bagnan-I, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000125/2022-2023 3539/ED 30/12/2022 1037 KARTICK BAL 20.35 0.00 0 60
Total 589.090.000 
Showing 1 to 13 of 13 entries