Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 1,024.7 185.01 18.06  
1 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New NDT of OHR of of Khila PWSSS BILL/00328/2024-2025 BP-2024-25-197 22/07/2024 JADAVPUR UNIVERSITY 1.77 0.00 0 0
2 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Preparation of DPR for new piped water supply scheme of Khila PWSS, Udaynarayanpur Block under Uluberia Sub-Division of Howrah Division PHE Dte. AE/RWS JE/RWS/Udaynaryanpur ORD/000255/2022-2023 329/AE/USD 16/08/2022 45 STEELCONC AND ASSOCIATES 4.01 3.89 97.01 0
3 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Work Order for Sinking of 3 (Three) Nos. 300 X 200 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Khila PWSS of RWS Howrah Sub-Division under Howrah Division, P. H.E. Dte. AE/RWS JE/RWS/Udaynaryanpur,JE/RWS/Uluberia I,JE Sadar ORD/000558/2022-2023 2488/HD 30/11/2022 60 M/S SYCHROTECH INDUSTRY 54.33 23.17 42.65 100
4 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Work Order for Construction of Pump House (5.40m x 3.60 m) with water supply & sanitary arrangement at 3rd TW site Khila W/S scheme at Udaynarayanpur Block under Howrah Division, P.H.E. Dte. AE/RWS JE/RWS/Udaynaryanpur,JE/RWS/Uluberia I,JE Sadar ORD/000623/2022-2023 2803/HD 21/12/2022 60 MAITY CONSTRUCTIONS 7.70 3.34 43.38 60
5 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Work Order for Laying HDPE pipeline & providing Functional Household Tap Connection(FHTC) of KHILA Piped Water Supply Scheme under Udaynaryanpur block under Howrah Division, PHE Dte. (Part-B). AE/RWS JE/RWS/Udaynaryanpur,JE/RWS/Uluberia I,JE Sadar ORD/000819/2022-2023 1104/HD 17/03/2023 45 JAHANGIR ALAM 113.00 15.11 13.37 35
6 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Acceptance cum Work Order for Laying HDPE pipeline & providing Functional Household Tap Connection (FHTC) of KHILA Piped Water Supply Scheme under Udaynaryanpur block under Uluberia Sub- Division, PHE Dte.(Part-A) AE/RWS JE/RWS/Udaynaryanpur,JE/RWS/Uluberia I,JE Sadar ORD/000884/2022-2023 1450/HD 30/03/2023 60 M/S EL-CON 620.60 135.72 21.87 35
7 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Material Requisition To Resource Division RTOR000042/2023-2024 2830/HD 04/08/2023 Resource Division 29.79 0.00 0 0
8 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Material Requisition To Resource Division RTOR000053/2023-2024 3217/HD 05/09/2023 Resource Division 38.86 0.00 0 0
9 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Material Requisition To Resource Division RTOR000070/2022-2023 421/HD 03/02/2023 Resource Division 8.77 0.00 0 0
10 HOWRAH Udaynarayanpur Electrical Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Adhoc payment to WBSEDCL against service connnection BILL/01127/2023-2024 null 28/06/2023 WBSEDCL 109.23 0.00 0 0
11 HOWRAH Udaynarayanpur Electrical Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New QUOTATION OF NEW SERVICE CONNECTION FOR KHILA W/S SCHEME, PH NO-III BILL/02133/2023-2024 124 20/07/2023 WBSEDCL 6.10 0.00 0 0
12 HOWRAH Udaynarayanpur Electrical Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Khila water supply scheme, T.W. No.- I, II & III, Block: Udaynaraynpur, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000116/2022-2023 3554/ED 30/12/2022 90 M/S P.P. ELECTRICALS 30.54 3.78 12.38 50
Total 1,024.69 185.02 18.06