Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 900.73 138.63 15.39  
1 HOWRAH Udaynarayanpur Howrah Division Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Construction of Boundary Wall, Construction of Approach Road and Land Development at HEAD WORK Site and 2nd Tube Well Site of SITAPUR Piped Water Supply Scheme at Udaynarayanpur Block Under Howrah Division, P.H.E. Dte. AE/RWS ORD/000037/2024-2025 2853/HD 21/06/2024 75 K.N ENTERPRISE 78.61 0.00 0 0
2 HOWRAH Udaynarayanpur Howrah Division Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Work Order for Sinking of 2 (Two) Nos. 300 X 200 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Sitapur PWSS of RWS Howrah Sub-Division under Howrah Division, P. H. E. Dte. AE/RWS JE/RWS/Udaynaryanpur,JE Sadar ORD/000564/2022-2023 2548/HD 02/12/2022 45 MUNSHI ENTERPRISE 36.53 15.67 42.9 90
3 HOWRAH Udaynarayanpur Howrah Division Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Work Order for Construction of Pump House (5.40m x 3.60 m) with water supply & sanitary arrangement at 2nd TW site Sitapur W/S scheme at Udaynarayanpur Block under Howrah Division, P.H.E. Dte. AE/RWS JE/RWS/Udaynaryanpur,JE Sadar ORD/000627/2022-2023 2808/HD 21/12/2022 60 APEX ENGINEERING 8.51 0.00 0 0
4 HOWRAH Udaynarayanpur Howrah Division Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Work order for construction of Pump House ( 5.40m x 3.60 m) with water supply & sanitary arrangement at HW site Sitapur W/S scheme at Udaynarayanpur Block under Howrah Division, P.H.E. Dte. AE/RWS JE/RWS/Udaynaryanpur,JE Sadar ORD/000674/2022-2023 166/HD 13/01/2023 60 APEX ENGINEERING 8.52 0.00 0 0
5 HOWRAH Udaynarayanpur Howrah Division Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Work Order for Construction of 450 cum Capacity, 20mtr. Staging Height RCC Elevated Reservoir As Per Departmental Design including Soil Investigation, Laying Distribution Pipeline & Providing FHTC (1759 nos) for Sitapur PWSS of Udaynarayanpur Block under Howrah Division, PHE Dte. AE/RWS JE/RWS/Udaynaryanpur,JE Sadar ORD/000710/2022-2023 380/HD 01/02/2023 180 GUPTA ENTERPRISE 566.63 122.96 21.7 10
6 HOWRAH Udaynarayanpur Howrah Division Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Material Requisition To Resource Division RTOR000046/2023-2024 2830/HD 04/08/2023 Resource Division 21.67 0.00 0 0
7 HOWRAH Udaynarayanpur Howrah Division Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Material Requisition To Resource Division RTOR000052/2023-2024 3217/HD 05/09/2023 Resource Division 25.95 0.00 0 0
8 HOWRAH Udaynarayanpur Howrah Division Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Material Requisition To Resource Division RTOR000074/2022-2023 421/HD 03/02/2023 Resource Division 1.84 0.00 0 0
9 HOWRAH Udaynarayanpur Electrical Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Adhoc Payment to WBSEDCL against service Connection BILL/01126/2023-2024 null 28/06/2023 WBSEDCL 117.51 0.00 0 0
10 HOWRAH Udaynarayanpur Electrical Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Quotation Bill for New Service Connection at Sitapur W/S. Sch. PH-II BILL/04590/2023-2024 590 29/12/2023 WBSEDCL 7.22 0.00 0 0
11 HOWRAH Udaynarayanpur Electrical Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Quotation Bill for New Service Connection at Sitapur W/S. Sch. PH-I BILL/04591/2023-2024 591 29/12/2023 WBSEDCL 6.37 0.00 0 0
12 HOWRAH Udaynarayanpur Electrical Sitapur Piper water Supply Scheme , Block- Udayanaryanpur, Dist- Howrah. , SM/11853 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Sitapur water supply scheme, T.W. No.- I & II, Block: Udaynarayanpur, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000160/2022-2023 3523/ED 30/12/2022 90 DIPALI CONSTRUCTION 21.37 0.00 0 0
Total 900.72 138.63 15.39