Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 622 1.35 0.22  
1 HOWRAH Bagnan - I Howrah Division Ulanpara Piped Water Supply Scheme with provision of FHTC Block- Bagnan-I, Howrah. , SM/11718 New Work Order for Laying Distribution System (HDPE & DI) & providing Functional Household Tap Connection (FHTC), Interconnection for 2nd TW and 1st Tube well (HW site) & Construction Of 400 cum Capacity, 20mtr. Staging Height RCC Elevated Reservoir As Per Departmental Type Design (Ref: Dept. Super Struc. DRG. No. PC I/OHR/11/2012) Including All pipe Connection including foundation design for ULANPARA PWSS OF BAGNAN-I BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE AE/Ulu ORD/000017/2023-2024 1651/HD 18/04/2023 365 SUDHAMAY MAJUMDAR 361.15 0.00 0 0
2 HOWRAH Bagnan - I Howrah Division Ulanpara Piped Water Supply Scheme with provision of FHTC Block- Bagnan-I, Howrah. , SM/11718 New Work Order for Preparation of DPR for new piped water supply scheme of Ulanpara PWSS, Bagnan-I Block under Uluberia Sub-Division of Howrah Division PHE Dte. AE/Ulu JE-USD,JE/RWS/Bagnan I ORD/000449/2021-2022 250/HD 07/02/2022 15 DULAL MAJUMDER 2.69 1.35 50.19 100
3 HOWRAH Bagnan - I Howrah Division Ulanpara Piped Water Supply Scheme with provision of FHTC Block- Bagnan-I, Howrah. , SM/11718 New Work Order for Sinking of 2 (Two) Nos. 300 X 200 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Ulanpara PWSS of Bagnan I Block Uluberia Sub-Division under Howrah Division, P. H. E. Dte. AE/Ulu ORD/000598/2022-2023 2714/HD 14/12/2022 45 AUXILIARY TUBEWELL DRILLERS 36.22 0.00 0 0
4 HOWRAH Bagnan - I Howrah Division Ulanpara Piped Water Supply Scheme with provision of FHTC Block- Bagnan-I, Howrah. , SM/11718 New Material Requisition To Resource Division RTOR000018/2023-2024 1754/HD 26/04/2023 Resource Division 42.67 0.00 0 0
5 HOWRAH Bagnan - I Howrah Division Ulanpara Piped Water Supply Scheme with provision of FHTC Block- Bagnan-I, Howrah. , SM/11718 New Material Requisition To Resource Division RTOR000027/2022-2023 1624/HD 05/08/2022 Resource Division 48.67 0.00 0 0
6 HOWRAH Bagnan - I Electrical Ulanpara Piped Water Supply Scheme with provision of FHTC Block- Bagnan-I, Howrah. , SM/11718 New Adhoc payment to WBSEDCL against service connnection BILL/01127/2023-2024 null 28/06/2023 WBSEDCL 109.23 0.00 0 0
7 HOWRAH Bagnan - I Electrical Ulanpara Piped Water Supply Scheme with provision of FHTC Block- Bagnan-I, Howrah. , SM/11718 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Ulanpara water supply scheme, T.W. No.- I & II, Block: Bagnan-I, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000132/2022-2023 3526/ED 30/12/2022 90 M/S, GHOSH ENTERPRISE 21.37 0.00 0 0
Total 622.00 1.35 0.22