Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 1,291.71 93.08 7.21  
1 HOWRAH Uluberia - II Howrah Division Ground Water Based Piped Water Supply Scheme for NAYACHAK, Block- Uluberia-II, Howrah. , SM/11641 New Laying Distribution Pipe Lines(UPVC & DI) With Allied Works and Providing Household Functional Tap Connection & Construction of 500 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (including pile foundation), pipe connection and cost of pipes, specials including foundation design for NAYACHAK PWSS OF ULUBERIA-II BLOCK UNDER THE ULUBERIA SUB-DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. AE/Ulu JE-USD ORD/000141/2023-2024 2808/HD 03/08/2023 365 GUPTA ENTERPRISE 775.72 93.08 12 37
2 HOWRAH Uluberia - II Howrah Division Ground Water Based Piped Water Supply Scheme for NAYACHAK, Block- Uluberia-II, Howrah. , SM/11641 New Work Order for Sinking of 3 (Three) Nos. 300 X 200 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Nayachak PWSS of Uluberia-II block of Uluberia Sub Division under Howrah Division, P. H. E. Dte. AE/Ulu ORD/000601/2022-2023 2717/HD 14/12/2022 60 AQUATECH ENGINEERS 54.31 0.00 0 0
3 HOWRAH Uluberia - II Howrah Division Ground Water Based Piped Water Supply Scheme for NAYACHAK, Block- Uluberia-II, Howrah. , SM/11641 New Material Requisition To Resource Division RTOR000026/2022-2023 1624/HD 05/08/2022 Resource Division 160.85 0.00 0 0
4 HOWRAH Uluberia - II Howrah Division Ground Water Based Piped Water Supply Scheme for NAYACHAK, Block- Uluberia-II, Howrah. , SM/11641 New Material Requisition To Resource Division RTOR000027/2023-2024 1754/HD 26/04/2023 Resource Division 159.48 0.00 0 0
5 HOWRAH Uluberia - II Electrical Ground Water Based Piped Water Supply Scheme for NAYACHAK, Block- Uluberia-II, Howrah. , SM/11641 New Adhoc payment to WBSEDCL against service connnection BILL/01127/2023-2024 null 28/06/2023 WBSEDCL 109.23 0.00 0 0
6 HOWRAH Uluberia - II Electrical Ground Water Based Piped Water Supply Scheme for NAYACHAK, Block- Uluberia-II, Howrah. , SM/11641 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Nayachak water supply scheme, T.W. No.- I & II, Block: Uluberia-II, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer5 ORD/000150/2022-2023 3518/ED 30/12/2022 90 JAGANNATH ENTERPRISE 21.36 0.00 0 0
7 HOWRAH Uluberia - II Electrical Ground Water Based Piped Water Supply Scheme for NAYACHAK, Block- Uluberia-II, Howrah. , SM/11641 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Nayachak water supply scheme, T.W. No. III, Block: Uluberia-II, District- Howrah under Electrical Division, PHE Dte. ORD/000882/2023-2024 3455/ED 11/08/2023 90 TAMAL ENTERPRISE 10.76 0.00 0 0
Total 1,291.72 93.08 7.21