Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
16 729.42 147.68 20.25  
1 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Preparation of DPR for Augmentation of Par-Radhanagar PWSS, Udaynarayanpur Block under Uluberia Sub-Division of Howrah Division PHE Dte AE/RWS JE/RWS/Udaynaryanpur ORD/000256/2022-2023 330/AE/USD 16/08/2022 45 STEELCONC AND ASSOCIATES 3.29 3.16 96.05 0
2 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Work Order for Laying HDPE pipeline & providing Functional Household Tap Connection (FHTC) of PER RADHANAGAR Piped Water Supply Scheme under Udaynaryanpur block under Howrah Division, PHE Dte. (Part-B) Mouza-Peruhareshpur AE/RWS JE/BLK/amta2,JE/RWS/Udaynaryanpur ORD/000432/2022-2023 2108/HD 13/10/2022 60 GHOSH ENTERPRISE. 149.58 60.52 40.46 65
3 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Work Order for Construction of 350 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (including pile foundation), along with part Laying of distribution and Providing Functional Household Tap Connection(FHTC) for Per Radhanagar Piped Water Supply scheme of Udayanarayanpur Block under Howrah Division P.H.E. Dte. in the District of Howrah.(Part-A) AE/RWS JE/BLK/amta2,JE/RWS/Udaynaryanpur,JE Sadar ORD/000479/2022-2023 2172/HD 21/10/2022 180 BALAJI UDDYOG 318.57 48.07 15.09 20
4 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Rising main & Inter Connection with both tube wells of Per Radhanagar PWSS In Udaynarayanpur Block under Howrah Division, PHE Dte. AE/RWS JE/BLK/AMTA2 ORD/000558/2023-2024 904/HD 27/02/2024 30 KUNAL BANERJEE 6.28 2.78 44.27 85
5 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Work Order for Sinking of 2 (Two) Nos. 300 X 200 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at PerRadhanagar PWSS of RWS Howrah Sub-Division under Howrah Division, P. H. E. Dte. AE/RWS JE/RWS/Udaynaryanpur,JE Sadar ORD/000561/2022-2023 2491/HD 30/11/2022 45 WATER TECH 36.22 15.39 42.49 100
6 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Work Order for Construction of Pump House (5.40m x 3.60 m) with water supply & sanitary arrangement at 2nd TW site Per-radhanagar W/S scheme at Udaynarayanpur Block under Howrah Division, P.H.E. Dte. AE/RWS JE/RWS/Udaynaryanpur,JE Sadar ORD/000622/2022-2023 2802/HD 21/12/2022 60 BINOY KOLEY 7.83 3.65 46.62 98
7 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Work Order for Construction of Pump House (5.40m x 3.60m) with water supply & sanitary arrangement at HW site Per Radhanagar W/S scheme at Udaynarayanpur Block under Howrah Division, P.H.E. Dte. AE/RWS JE/RWS/Udaynaryanpur,JE Sadar ORD/000625/2022-2023 2805/HD 21/12/2022 60 M/S M.K. MONDAL 7.83 3.65 46.62 95
8 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Material Requisition To Resource Division RTOR000009/2024-2025 3884/HD 05/09/2024 Resource Division 1.13 0.00 0 0
9 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Material Requisition To Resource Division RTOR000034/2023-2024 2716/HD 25/07/2023 Resource Division 13.78 0.00 0 0
10 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Material Requisition To Resource Division RTOR000045/2023-2024 2830/HD 04/08/2023 Resource Division 19.05 0.00 0 0
11 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Material Requisition To Resource Division RTOR000064/2023-2024 29/HD 03/01/2024 Resource Division 0.87 0.00 0 0
12 HOWRAH Udaynarayanpur Howrah Division PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Material Requisition To Resource Division RTOR000073/2022-2023 421/HD 03/02/2023 Resource Division 14.26 0.00 0 0
13 HOWRAH Udaynarayanpur Electrical PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Adhoc Payment to WBSEDCL against service Connection BILL/01126/2023-2024 null 28/06/2023 WBSEDCL 117.51 0.00 0 0
14 HOWRAH Udaynarayanpur Electrical PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Quotation Bill for New Service Connection at Par-Radhanagar BILL/01884/2022-2023 228 29/03/2023 WBSEDCL 8.72 0.00 0 0
15 HOWRAH Udaynarayanpur Electrical PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Quotation bill for New Service Connection at Par-Radhanagar Water Supply Scheme. BILL/04051/2023-2024 331 06/10/2023 WBSEDCL 2.67 0.00 0 0
16 HOWRAH Udaynarayanpur Electrical PER RADHANAGAR PIPED WATER SUPPLY SCHEME WITH FHTC , SM/11572 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Per Radhanagr water supply scheme, T.W. No. III & IV, Block: Udaynarayanpur, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000255/2022-2023 922/ED 22/02/2023 90 GLACIER ENGINEERING CO. 21.83 10.46 47.92 80
Total 729.41 147.68 20.25