Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 565.19 152.34 26.95  
1 HOWRAH Amta - II Howrah Division Ground Water Based Piped Water Supply Scheme for Saoria Block- Amta-II, Dist-Howrah. , SM/11222 New Work Order for Sinking of 2 (Two) Nos. 250 X 150 mm Dia and 240 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Saoria PWSS at Amta-II Block of Howrah District under Howrah Division, P. H. E. Dte. AE/Ulu JE/BLK/amta2,JE/RWS/Amta II ORD/000337/2022-2023 1836/HD 08/09/2022 40 DIBAKAR SHAW 26.67 13.33 49.98 100
2 HOWRAH Amta - II Howrah Division Ground Water Based Piped Water Supply Scheme for Saoria Block- Amta-II, Dist-Howrah. , SM/11222 New Work Order for Laying of Distribution System(UPVC & DI), Providing Functional Household Tap Connection (FHTC), Interconnection between tube wells, Construction of 200 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (including pile foundation), pipe connection and cost of pipes, specials at HW site and construction of Two storied switch room ( 5.4 x 3.6) & (3.6 x3.0) with water supply & sanitary arrangement cum godown at Head Work site & 2nd Tube well site of SAORIA PWSS of Amta-II Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte. AE/Ulu JE/BLK/amta2 ORD/000426/2022-2023 2085/HD 11/10/2022 180 KAMIRUL SK AND CO. 370.75 129.15 34.83 60
3 HOWRAH Amta - II Howrah Division Ground Water Based Piped Water Supply Scheme for Saoria Block- Amta-II, Dist-Howrah. , SM/11222 New Work Order for Preparation of DPR for new piped water supply scheme of Saoria PWSS, Amta-II Block under Uluberia Sub-Division of Howrah Division PHE Dte. AE/Ulu JE/RWS/Amta II ORD/000443/2021-2022 244/HD 07/02/2022 15 GEOTECHNICAL ENGINEERS CONSORTIUM 2.86 2.86 100 0
4 HOWRAH Amta - II Howrah Division Ground Water Based Piped Water Supply Scheme for Saoria Block- Amta-II, Dist-Howrah. , SM/11222 New Material Requisition To Resource Division RTOR000025/2022-2023 1624/HD 05/08/2022 Resource Division 24.23 0.00 0 0
5 HOWRAH Amta - II Electrical Ground Water Based Piped Water Supply Scheme for Saoria Block- Amta-II, Dist-Howrah. , SM/11222 New Adhoc payment to WBSEDCL against service connnection BILL/01127/2023-2024 null 28/06/2023 WBSEDCL 109.23 0.00 0 0
6 HOWRAH Amta - II Electrical Ground Water Based Piped Water Supply Scheme for Saoria Block- Amta-II, Dist-Howrah. , SM/11222 New Quotation Bill for New Service Connection at Sauria W/S. Sch. TW-I BILL/04513/2023-2024 558 21/12/2023 WBSEDCL 3.59 0.00 0 0
7 HOWRAH Amta - II Electrical Ground Water Based Piped Water Supply Scheme for Saoria Block- Amta-II, Dist-Howrah. , SM/11222 New Quotation Bill for New Service Connection at Sauria W/S. Sch. TW-II BILL/04514/2023-2024 557 21/12/2023 WBSEDCL 7.61 0.00 0 0
8 HOWRAH Amta - II Electrical Ground Water Based Piped Water Supply Scheme for Saoria Block- Amta-II, Dist-Howrah. , SM/11222 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Saoria water supply scheme, T.W. No.- I & II, Block: Amta-II, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer3,Junior Engineer6 ORD/000136/2022-2023 3521/ED 30/12/2022 90 GLACIER ENGINEERING CO. 20.25 7.00 34.57 90
Total 565.18 152.34 26.95