Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
18 1,789.39 573.82 32.07  
1 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Payment against requirement of fund for restoration of PMGSY Road WB-09-250 (T032- Malick Pukur ) BILL/00315/2023-2024 BP-2023-24-115 27/06/2023 WBSRDA 10.14 0.00 0 0
2 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Payment against requestion of fund for restoration of PMGSY road Package No- WB-09-250 (TO-32- Mallick Pukur) of Augmentation of Kalyanpur and Birampur Water Supply Scheme BILL/00548/2023-2024 BP-2023-24-259 31/08/2023 WBSRDA 10.14 0.00 0 0
3 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Construction of 700 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection at Augmentation of Kalyanpur Birampur PWSS of Bagnan-I Block under Uluberia Sub-Divison under Howrah Division, PHE Dte. AE/Ulu JE/USD ORD/000012/2024-2025 2645/HD 07/06/2024 240 UNIQUE AGENCY 191.00 0.00 0 0
4 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Work Order for Augmentation of Kalyanpur Birampur Water Supply Schemem with LDS, Rising Main, FHTC work, at Bagnan-I Block of Howrah Division, PHE Dte. AE/Ulu JE/USD ORD/000022/2022-2023 966/HD 29/04/2022 8 M/S EL-CON 714.88 402.51 56.3 100
5 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Work Order for Sinking of 2 (Two) nos PVC big dia Tube well 300 mm x 200 mm dia of 250 mtr deep for Augmentation of Kalyanpur-Birampur W/S scheme at Bagnan-I Block in Uluberia SubDivision P.H.E. Dte. Under Howrah Division, P.H.E Dte. AE/RWS,AE/Ulu JE/RWS/Bagnan I ORD/000028/2022-2023 1009/HD 05/05/2022 30 AQUATECH ENGINEERS 35.20 33.27 94.52 0
6 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Work order for Additional laying of pipeline at Augmentation of Kalyanpur Birampur Water Supply Scheme at Bagnan-I Block under Uluberia Sub-Division PHE Dte of Howrah Division PHE Dte. AE/Ulu JE/USD ORD/000089/2023-2024 1987/HD 15/05/2023 120 M/S EL-CON 247.87 120.19 48.49 100
7 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Work Order for Soil Investigation for the work of Construction of R.C.C Elevated Reservoir of Capacity 700m3 Staging Height 20 mtr. for Kalyanpur Birampur W/S Scheme under Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. AE/RWS JE/RWS/Bagnan I ORD/000415/2021-2022 386/HD 22/02/2022 20 PROSENJIT DAS 0.65 0.65 100 0
8 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Material Requisition To Resource Division RTOR000019/2022-2023 1624/HD 05/08/2022 Resource Division 18.99 0.00 0 0
9 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Material Requisition To Resource Division RTOR000041/2022-2023 2639/HD 09/12/2022 Resource Division 12.08 0.00 0 0
10 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation WBSRDA PAYMENT VCH/000564/2022-2023 null 07/09/2022 WBSRDA 13.77 0.00 0 0
11 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Indent of Material VCH/000953/2021-2022 BP-2021-22-402 14/03/2022 EXECUTIVE ENGINNER RESOURCES DIVISION 513.19 0.00 0 0
12 HOWRAH Howrah Division Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Preparation of DPR for augmentation of existing piped water supply scheme of Kalyanpur Birampur, Bagnan-I under Uluberia Sub-Division of Howrah Division PHE Dte. VCH/000961/2021-2022 BP-2021-22-408 14/03/2022 RADIANT 3.68 0.00 0 0
13 HOWRAH Electrical Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Shifting of LT OH Line BILL/00212/2022-2023 144 30/01/2023 WBSEDCL 0.27 0.00 0 0
14 HOWRAH Electrical Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Supply, Delivery & Installation of submersible pumping machinery & other Electrical/Mechanical equipments etc. including allied works for Kalyanpur Birampur W/S. Sch.PH-II Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000048/2022-2023 2101/HMSD 24/11/2022 30 DIPA CHHETRI 4.25 4.25 100 0
15 HOWRAH Electrical Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Kalyanpur Birampur water supply scheme, P.H. No. - I (Replacement Tubewell), Block Bagnan-I District - Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000064/2022-2023 2100/HMSD 24/11/2022 30 OSMAN SEKH 4.12 4.03 97.82 0
16 HOWRAH Electrical Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Supply, delivery of electro mechanical equipments for Kalyanpur Birampur water supply scheme, P.H. No. I (Replacement tubewell), District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000068/2022-2023 35/HMSD 05/01/2023 30 J.K. ENGINEERING CO. 2.87 2.69 93.73 0
17 HOWRAH Electrical Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Supply, delivery of electro mechanical equipments for Kalyanpur Birampur water supply scheme, P.H. No. II (Replacement tubewell), District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000069/2022-2023 36/HMSD 05/01/2023 30 P.K. ENTERPRISE 3.55 3.49 98.31 0
18 HOWRAH Electrical Augmentation of ground based piped Water Supply Scheme for Kalyanpur Birampur to Accomodate FHTC , SM/10145 Augmentation Supply, delivery and installation of voltage correcting device and other allied works for Kalyanpur Birampur water supply scheme, P.H. No.-II, District- Howrah under Electrical Division, PHE Dte. ORD/001426/2021-2022 1245/HMSD 14/07/2021 21 A.G. ENTERPRISE 2.74 2.74 100 0
Total 1,789.37 573.80 32.07