Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 182 4.55 2.5  
1 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Surveying, Planning, Design, Delivery, Erection and Construction of Intake arrangement, WTP including inlet well , flash mixture Chemical House , Clariflocculator with sump , Rapid Gravity Filter with back washing system, sludge pond with sludge pumping system , CWR, OHR, Rising Main, Remodelling of Distribution System, Administrative Building, Sub-Station Building, Lab, Store ,Staff Quarters ,Boundary wall, Approach Road all complete including Mechanical/Electrical works both for raw water intake and treatment plant consisting of supply, installation, commissioning of pumping machineries, substation equipments etc inclusive of all kinds of accessories and ancillaries etc all complete along with 6 months trial run & 5(five) years operation and maintenance¿ for Surface Water Based Water Supply Scheme at Bally Jagacha Block, District ¿ Howrah ORD/000002/2013-2014 work Order-1697/HD 06/11/2013 GANNON DUNKERLEY & CO. LTD. 25.83 0.00 0 0
2 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Work Order for Riverine effect over Construction of 400 m3 capacity and 20 mtr staging height RCC Over Head Reservoir including pile foundation & delivery inlet & outlet and overflow pipe connection and allied works as per departmental drawing (DRG No. ¿ PC-I/OHR/11/2012) at Chitnan water supply scheme under Uluberia Sub-Division, under Howrah Division PHE Dte AE/Ulu JE/USD ORD/000395/2021-2022 160/HD 25/01/2022 45 S.N ENTERPRISE 4.55 4.55 100 0
3 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block under Howrah Division, PHE Dte. (Part-B) [Beral Mouza] [Number of FHTC to be provided (Approx) : 387] AE/Ulu JE/USD ORD/000396/2020-2021 45/HD 05/01/2021 30 MS ASOKE GHOSH AND BROTHERS 22.44 0.00 0 0
4 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Retrofitting Chitnan Water Supply Scheme VCH/000005/2021-2022 null 19/04/2021 JAHANGIR ALAM 23.87 0.00 0 0
5 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Retrofitting Chitnan Water Supply Scheme VCH/000006/2021-2022 W/120 20/07/2021 ASHOKE GHOSH AND BROTHERS 15.46 0.00 0 0
6 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Retrofitting Chitnan Water Supply scheme VCH/000023/2021-2022 W/170 09/08/2021 PRASANTA SANA 19.78 0.00 0 0
7 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Retrofitting Chitnan VCH/000038/2021-2022 W/171 09/08/2021 BOSE AND CO. 26.83 0.00 0 0
8 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Retrofitting Chitnan VCH/000039/2021-2022 null 03/06/2021 S.N ENTERPRISE 26.88 0.00 0 0
9 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Work Order for Riverine effect over Construction of 400 m3 capacity and 20 mtr staging height RCC Over Head Reservoir including pile foundation & delivery inlet & outlet and overflow pipe connection and allied works as per departmental drawing (DRG No. ¿ PC-I/OHR/11/2012) at Chitnan water supply scheme under Uluberia Sub-Division, under Howrah Division PHE Dte VCH/000348/2022-2023 null 20/07/2022 S.N ENTERPRISE 3.52 0.00 0 0
10 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Construction of Bounadry wall Chitnan Water supply scheme VCH/000405/2022-2023 BP-2022-23-71 14/06/2022 M/S SARADA UDYOG 2.14 0.00 0 0
11 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Construction of 28 nos stand post at in various place of Chitnan Water Supply scheme in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. (Part-II) VCH/000802/2021-2022 BP-2021-22-338 17/02/2022 ANUP PAUL 2.63 0.00 0 0
12 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Construction of 35 nos stand post at in various place of Chitnan Water Supply scheme in Uluberia Sub-Division, under Howrah Division, P.H.E. Dte. (Part-I) VCH/000803/2021-2022 BP-2021-22-339 17/02/2022 ANUP PAUL 3.28 0.00 0 0
13 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block , SM/07395 Retrofitting Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Chitnan Piped Water Supply Scheme under Amta-II Block under Howrah Division, PHE Dte. (Part-C) [Mirgram Mouza] [Number of FHTC to be provided (Approx) : 415] VCH/001010/2021-2022 BP-2021-22-472 30/03/2022 PRASANTA SANA 4.79 0.00 0 0
Total 181.98 4.55 2.5