Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 156.77 32.35 20.64  
1 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Construction of Approach road 3.00 mtr wide at Pump House -I of Bikihakola PWSS at Howrah Sadar Sub- Division under Howrah Division , P.H.E Dte AE/SADAR ORD/000097/2021-2022 1449/HD 13/07/2021 30 S.M. CONSTRUCTION 4.30 2.01 46.74 0
2 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Work Order for Adopting Jack Pushing of 600 mm Dia M.S pipe as Casing to Cross Water carrier Pipe(Between Node Point 200-203 of LDS drawing) on Ranihati- Amta Road and adjoining work of Biki hakola Water Supply Scheme of Howrah Sadar Sub-Division, under Howrah Division P.H.E. Dte. AE/SADAR ORD/000413/2021-2022 377/HD 21/02/2022 30 SAMIRON GHOSH 26.38 26.36 99.92 0
3 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Work Order for Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distributin system of Bikihakola piped water supply scheme under Jagatballavpur Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. (Phase-II) Part- A AE/SADAR ORD/000435/2021-2022 349/HD 17/02/2022 30 UNIVERSAL CORPORATION 4.30 3.98 92.56 0
4 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distributin system of Bikiha kola piped water supply scheme under Panchla Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. (Phase-IV) AE/SADAR ORD/000495/2020-2021 425/HD 11/02/2021 30 G.B. CONSTRUCTION AND CO 92.50 0.00 0 100
5 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Work Order Retrofitting work of Laying Pipeline From Node Point 4-162, 162-220 for Bikihakola PWSS at Panchla Block of Howrah Sadar Sub Division under Howrah Division, P. H. E. Dte. AE/SADAR ORD/000596/2022-2023 2606/HD 07/12/2022 45 UNIVERSAL CORPORATION 11.28 0.00 0 40
6 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Work Order for Laying of Delivery Main Proposal 700 cum reservoir for BikihaKola Water Supply Scheme at Panchla Block under Howrah Division, PHE Dte. (Part-IV) VCH/000263/2022-2023 BP-2022-23-49 11/05/2022 UNIVERSAL CORPORATION 1.55 0.00 0 0
7 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Work Order for Laying of Delivery Main Proposal 700 cum reservoir for BikihaKola Water Supply Scheme at Panchla Block under Howrah Division, PHE Dte. (Part-III) VCH/000281/2022-2023 BP-2022-23-50 11/05/2022 UNIVERSAL CORPORATION 3.19 0.00 0 0
8 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Work order for Survey & Collection of house hold details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system in Bikihakola Piped Water Supply Scheme under Howrah District. (Part-B) VCH/000303/2022-2023 BP-2022-23-45 11/05/2022 PRADIP KUMAR JATI 0.73 0.00 0 0
9 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Work Order for laying of Delivery Main proposed 700 cum reservoir for Bikihakola Water Supply scheme at Panchla Block under Howrah Division, P.H.E. Dte.( Part -II) VCH/000304/2022-2023 BP-2022-23-51 11/05/2022 UNIVERSAL CORPORATION 4.44 0.00 0 0
10 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Work Order for laying of Delivery Main proposed 700 cum reservoir for Bikihakola Water Supply scheme at Panchla Block under Howrah Division, P.H.E. Dte. VCH/000305/2022-2023 BP-2022-23-52 11/05/2022 UNIVERSAL CORPORATION 4.85 0.00 0 0
11 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Work Order for Survey & Collection of house hold details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system in Bikihakola Piped Water Supply Scheme under Howrah District. VCH/000312/2022-2023 BP-2022-23-53 11/05/2022 UNIVERSAL CORPORATION 0.73 0.00 0 0
12 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting O & M of distribution system and rising main pipe line (CI/DI/AC/UPVC) of Bikihakhola w/s scheme under Howrah Division, PHE Dte. Period for O & M (01.09.2021 to 31.12.2021) VCH/000989/2021-2022 BP-2021-22-434 23/03/2022 UNIVERSAL CORPORATION 0.99 0.00 0 0
13 HOWRAH Howrah Division Retrofitting works for providing Functional Household Tap Connection FHTC under Bikihakola PWSS within Panchla Block (Phase-4) , SM/07077 Retrofitting Continuation order for Trial Run and Operation & maintenance of pipe lines (LDS & Risingmain) sluice valve & street stand post etc. including operation of sluice valves at Bikihakola w/s scheme under Howrah Sadar Sub-Division of Howrah Division, P.H.E. Dte. (09/05/2021 to 31/08/2021)In continuation to the order under reference, and your application dated 06-05-2021, you are requested to continue the above mentioned work in consultation with the Assistant Engineer, Howrah Sadar Sub-Division, PHE Dte. VCH/000993/2021-2022 BP-2021-22-435 23/03/2022 UNIVERSAL CORPORATION 1.53 0.00 0 0
Total 156.77 32.35 20.64