Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 165.7 0 0  
1 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Balichak and Banuchak mouza of Balichak piped water supply scheme (Phase-II) , SM/06784 Retrofitting Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system of Balichak piped water supply scheme under Amta-I Block under Howrah Division, PHE Dte. (Part-D) (for Banuchak mouza) AE/Ulu JE/USD ORD/000161/2020-2021 1624/HD 09/11/2020 30 M/S. CHANDIMATA CONSTRUCTION 18.40 0.00 0 0
2 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Balichak and Banuchak mouza of Balichak piped water supply scheme (Phase-II) , SM/06784 Retrofitting Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system of Balichak piped water supply scheme under Amta-I Block under Howrah Division, PHE Dte. (Part-E) for Balichak mouza part) AE/Ulu JE/USD ORD/000162/2020-2021 1625/HD 09/11/2020 30 P B ENTERPRISE 26.26 0.00 0 0
3 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Balichak and Banuchak mouza of Balichak piped water supply scheme (Phase-II) , SM/06784 Retrofitting Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system of Balichak piped water supply scheme under Amta-I Block under Howrah Division, PHE Dte. (Part-F) for Balichak mouza part) AE/Ulu JE/USD ORD/000163/2020-2021 1626/HD 09/11/2020 30 P B ENTERPRISE 27.61 0.00 0 0
4 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Balichak and Banuchak mouza of Balichak piped water supply scheme (Phase-II) , SM/06784 Retrofitting Material Requisition To Resource Division RTOR000031/2021-2022 495/HD 07/03/2022 Resource Division 8.01 0.00 0 0
5 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Balichak and Banuchak mouza of Balichak piped water supply scheme (Phase-II) , SM/06784 Retrofitting Survey and Collection of houshold details through mobile app and geo tagging the same including IMIS entry of water tap connection in each house hold from existing distribution system within scheme jurisdiction in different pipe water supply scheme VCH/000077/2021-2022 W/39 11/06/2021 STEELCONC AND ASSOCIATES 4.73 0.00 0 0
6 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Balichak and Banuchak mouza of Balichak piped water supply scheme (Phase-II) , SM/06784 Retrofitting Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Purba Bajepratap and Dhurkhali Mouza of Balichak piped water supply VCH/000592/2021-2022 W/594 21/12/2021 RANA ENTERPRISE 7.58 0.00 0 0
7 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Balichak and Banuchak mouza of Balichak piped water supply scheme (Phase-II) , SM/06784 Retrofitting Retrofitting BalichakWater Supply Scheme VCH/000891/2020-2021 844383 26/03/2021 N. G ENGINEERING 21.63 0.00 0 0
8 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Balichak and Banuchak mouza of Balichak piped water supply scheme (Phase-II) , SM/06784 Retrofitting Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Purba Bajepratap and Dhurkhali Mouza of Balichak piped water supply scheme. VCH/000953/2020-2021 8443107 30/03/2021 P B ENTERPRISE 23.52 0.00 0 0
9 HOWRAH Howrah Division Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Balichak and Banuchak mouza of Balichak piped water supply scheme (Phase-II) , SM/06784 Retrofitting Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system at Purba Bajepratap and Dhurkhali Mouza of Balichak piped water supply scheme. VCH/000973/2020-2021 8443120 30/03/2021 GHOSH CONCERN 27.96 0.00 0 0
Total 165.71 0.00 0