Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
38 59,047.83 591.89 1  
1 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Laying of DI pipe along with interconnection arrangement at OHR site & Construction of Boundary wall & pathway & Sinking of Tubewell at Balarampur (Zone-II) under Purulia W/S Scheme (southern sector) of Purulia Division, PHE Dte. ORD/000203/2024-2025 900/PD 07/05/2024 60 STABILITY INFRASTRUCTURE PVT. LTD. 96.08 0.00 0 0
2 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Laying of DI pipe along with interconnection arrangement at OHR site & Construction of Boundary wall & pathway & Sinking of Tubewell at Balarampur (Zone-I) under Purulia W/S Scheme (southern sector) of Purulia Division, PHE Dte. ORD/000204/2024-2025 901/PD 07/05/2024 60 M/S ANMOL ENGICON 96.02 0.00 0 0
3 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Laying of DI pipe along with interconnection arrangement at OHR site & Construction of Boundary wall & pathway & Sinking of Tubewell at Baghmundi (Zone-VI) under Purulia W/S Scheme (southern sector) of Purulia Division, PHE Dte. ORD/000205/2024-2025 902/PD 07/05/2024 60 AEROSPATIAL SOLUTION PRIVATE LIMITED 94.42 0.00 0 0
4 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Laying of DI pipe along with interconnection arrangement at OHR site & Construction of Boundary wall & pathway & Sinking of Tubewell at Baghmundi (Zone-IX) under Purulia W/S Scheme (southern sector) of Purulia Division, PHE Dte.(Ajodhya Hill Area) Assistant Engineer Junior Engineer-2 ORD/000220/2024-2025 1072/PD 07/06/2024 60 SAROJ KUMAR SINGH 96.58 0.00 0 0
5 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction of Boundary wall & Sinking of T/well at Manbazar-II, Zone-VIII under Purulia W/S Scheme under Purulia Sadar Sub-Division under Purulia Division, PHE Dte. ORD/000221/2024-2025 1095/PD 07/06/2024 60 SUBRATA MAHAPATRA 25.01 0.00 0 0
6 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Laying of DI pipe along with interconnection arrangement at OHR site & Construction of Boundary wall & pathway & Sinking of Tubewell at Baghmundi (Zone-II) under Purulia W/S Scheme (southern sector) of Purulia Division, PHE Dte. (Ajodhya Hill Area) Assistant Engineer Junior Engineer-2 ORD/000230/2024-2025 1065/PD 07/06/2024 60 VIVEKANANDA CONSTRUCTION 94.95 0.00 0 0
7 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction of New Boundary wall and other allied works at Manbazar Riversite (Harekishtapur) under Purulia W/S Scheme (Southern Sector) under Purulia Sadar Sub-Division under Purulia Division, PHE Dte. ORD/000236/2024-2025 1077/PD 07/06/2024 60 CHANDAN CHATTERJEE 31.23 0.00 0 0
8 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Laying of branch pipeline & parallel pipeline over existing pipeline from Burudi More to Dharampur to providing existing FHTC due to widening of PWD road under Purulia water supply scheme (Southern Sector) under Purulia Division, PHE Dte. ORD/000237/2024-2025 1083/PD` 07/06/2024 60 ANGEL LABOUR CONTRACT & CONSTRUCTION CO OPERATIVE SOCIETY LTD 7.64 0.00 0 0
9 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Laying of DI pipe along with interconnection arrangement at OHR site & Construction of Boundary wall & pathway & Sinking of Tubewell at Baghmundi (Zone-V) under Purulia W/S Scheme (southern sector) of Purulia Division, PHE Dte.(Ajodhya Hill Araea) ORD/000259/2024-2025 1071/PD 07/06/2024 60 SHREYA ENTERPRISES 94.55 0.00 0 0
10 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and commissioning of RCC Over Head Reservoirs including Laying Distribution Pipe lines and providing FHTCs including other allied works & Operation & Maintenance of Distributions, Pipe lines (DI/HDPE), including Sluice Valves & FHTCs for the period of thirty six (36) month at Zone- X & XI of Bandwan Block under Purulia Piped Water Supply Scheme (Southern Sector) under Purulia Divn. PHE Dte.(SL-7) Assistant Engineer Junior Engineer ORD/000278/2023-2024 1103/PD 14/08/2023 270 ANUP KUMAR SAHA 854.21 0.00 0 60
11 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction of Boundary wall & Sinking of T/well at Manbazar-II, Zone-VII under Purulia W/S Scheme under Purulia Sadar Sub-Division under Purulia Division, PHE Dte. ORD/000341/2024-2025 1367/PD 25/07/2024 30 KOUSHIK CHATTERJEE 20.13 0.00 0 0
12 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Laying of DI pipe along with interconnection arrangement at OHR site & Construction of Boundary wall & pathway & Sinking of Tubewell at Baghmundi (Zone-X) under Purulia W/S Scheme (southern sector) of Purulia Division, PHE Dte. ORD/000486/2024-2025 1073/PD 07/06/2024 60 SAIKAT RAY 95.21 0.00 0 0
13 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and commissioning of RCC Over Head Reservoirs including Laying Distribution Pipe lines and providing FHTCs including other allied works & Operation & Maintenance of Distributions, Pipe lines (DI/HDPE), including Sluice Valves & FHTCs for the period of thirty-six (36) months at Zone-V & VI of Bandwan Block under Purulia Piped Water Supply Scheme (Southern Sector) under Purulia Division, PHE Dte. (SL - 4) Assistant Engineer ORD/000761/2023-2024 1367/PD 14/09/2023 270 ANUP KUMAR SAHA 647.66 0.00 0 0
14 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 150 CUM and staging height 20 mtr as per approved drawing (No: PC-I/OHR/3/2012) including Laying Distribution Pipe line and providing FHTC including other allied works & Operation & Maintenance of Distribution, Pipe line (DI/HDPE), including Sluice Valve & FHTC for the period of thirty-six (36) months at Zone-XVI of Bandwan Block under Purulia Piped Water Supply Scheme (Southern Sector) under Purulia Division, PHE Dte. (SL - 12) Assistant Engineer Junior Engineer ORD/000762/2023-2024 1368/PD 14/09/2023 270 ANUP KUMAR SAHA 449.89 63.63 14.14 50
15 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and commissioning of RCC Over Head Reservoirs including Laying Distribution Pipe lines and providing FHTCs including other allied works & Operation & Maintenance of Distributions, Pipe lines (DI/HDPE), including Sluice Valves & FHTCs for the period of thirty-six (36) months at Zone-X & XI of Bandwan Block under Purulia Piped Water Supply Scheme (Southern Sector) under Purulia Division, PHE Dte. (SL - 7) Assistant Engineer Junior Engineer ORD/000763/2023-2024 1369/PD 14/09/2023 270 ANUP KUMAR SAHA 854.21 144.17 16.88 65
16 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 100 CUM and staging height 20 mtr as per approved drawing (No: PC-I/OHR/3/2012) including Laying Distribution Pipe line and providing FHTC including other allied works & Operation & Maintenance of Distribution, Pipe line (DI/HDPE), including Sluice Valve & FHTC for the period of thirty-six (36) months at Zone-XIII of Bandwan Block under Purulia Piped Water Supply Scheme (Southern Sector) under Purulia Division, PHE Dte. (2nd Call)(SL - 4) Assistant Engineer Junior Engineer ORD/000764/2023-2024 1370/PD 14/09/2023 270 SAMAN KUMAR MAHATO 184.53 16.41 8.89 40
17 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and commissioning of RCC Over Head Reservoirs including Laying Distribution Pipe lines and providing FHTCs including other allied works & Operation & Maintenance of Distributions, Pipe lines (DI/HDPE), including Sluice Valves & FHTCs for the period of thirty-six (36) months at Zone-III & IV of Bandwan Block under Purulia Piped Water Supply Scheme (Southern Sector) under Purulia Division, PHE Dte. (SL - 3) Assistant Engineer ORD/000765/2023-2024 1371/PD 14/09/2023 270 ANUP KUMAR SAHA 671.47 0.00 0 0
18 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and Commissioning of RCC Over Head Reservoir (Torch Type With solid raft) of capacity 150 CUM and staging height 20 mtr as per approve drawing ( No:PC-I/OHR/3/2012) including Laying Distribution Pipe line and providing FHTC including other allied works & Opearation & Maintenance of Distribution, Pipe line (DI/HDPE), including Sluice Value & FHTC for period of thirty six (36) month at Zone- XV of Bandwan Block under Purulia Piped Water Supply Scheme (southern Sector ) under Purulia Divn. PHE Dte. (SL-11) Assistant Engineer Junior Engineer-3 ORD/000777/2023-2024 1419/PD 29/09/2023 270 MS D.PALIT AND CO. 400.45 21.03 5.25 10
19 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 350 CUM and staging height 20 mtr as per approved drawing (No: PC-I/OHR/3/2012) including Laying Distribution Pipe line and providing FHTC including other allied works & Operation & Maintenance of Distribution, Pipe line (DI/HDPE), including Sluice Valve & FHTC for the period of thirty-six (36) months at Zone-II of Bandwan Block under Purulia Piped Water Supply Scheme (Southern Sector) under Purulia Division, PHE Dte. (SL-2) Assistant Engineer Junior Engineer ORD/000781/2023-2024 1421/PD 29/09/2023 270 MS D.PALIT AND CO. 478.83 0.00 0 45
20 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and Commissioning of RCC Over Head Reservoir including Laying Distribution Pipe Lines and providing FHTCs including other allied works & Operation & Maintenance of Distributions, Pipe lines (DI/HDPE), including Sluice Valves & FHTCs for the peroid of thirty six (36) month at Zone- VII & VIII of Bandwan Block under Purulia Piped Water Supply Scheme (southern Sector) under Purulia Divn. PHE Dte. (2nd Call) (SL No. 3) Assistant Engineer Junior Engineer-3 ORD/000797/2023-2024 1430/PD 29/09/2023 270 ANUP KUMAR SAHA 649.84 0.00 0 35
21 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and Commissioning of RCC Over Head Reservoir (Torch Type With solid raft) of capacity 200 CUM and staging height 20 mtr as per approve drawing ( No:PC-I/OHR/3/2012) including Laying Distribution Pipe line and providing FHTC including other allied works & Operation & Maintenance of Distribution, Pipe line (DI/HDPE), including Sluice Value & FHTC for period of thirty six (36) month at Zone- XII of Bandwan Block under Purulia Piped Water Supply Scheme (Southern Sector ) under Purulia Divn. PHE Dte. (SL-8) Assistant Engineer ORD/000801/2023-2024 1431/PD 29/09/2023 270 MD AAMIR KHAN 552.37 0.00 0 0
22 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and Commissioning of RCC Over Head Reservoir(s) including Laying Distribution Pipe Line(s) and providing FHTCs including other allied works & Operation & Maintenance of Distributions , Pipe Line (DI/HDPE), including Sluice Valves & FHTCs for the period of thirty six month (36) at Zone- I to XVI in Baghmundi Block and Zone I to X in Balarampur Block under Purulia Piped Water Supply Scheme ( Southern Sector) under Purulia Divn. PHE Dte. Assistant Engineer Junior Engineer ORD/001578/2023-2024 1820/PD 12/12/2023 360 M/S ANAND SINGH 10,753.43 346.65 3.22 17
23 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Design, Surveying,Engineering, Supplying and Construction, Erection, Installation, Testing,Commissioning, of Fixed type Intake Jetty with Pump house, Construction of Sub-station; Raw Water Raising Main Bank Protection, 40 MLD (Minimum) capacity Water Treatment Plant (WTP) based on conventional technologies + 20% overloading; Clear Water Pumping Mains, Booster Stations (11 numbers) at Arsha, Baghmundi, Balarampur, Bandwan, Manbazar I (part), Manbazar II & Purulia I (Part) Blocks including pumping machineries on EPC/ Turnkey basis in a single package including 3 (three) months Trial Run and Operation & Maintenance for 3 years for Surface Based W/S scheme for Southern Sector under Purulia Distric. Assistant Engineer Junior Engineer,Junior Engineer-1,Junior Engineer-3 ORD/001820/2023-2024 53/PD 09/01/2024 810 WPIL LIMITED 32,180.00 0.00 0 0
24 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction and Commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 100 CUM and staging height 20 mtr as per approved drawing (No: PC-I/OHR/3/2012) including Laying Distribution Pipe Lines and providing FHTCs including other allied works & Operation & Maintenance of Distributions , Pipe Line (DI/HDPE), including Sluice Valves & FHTCs for the period of thirty six month (36) at Zone-XIV of Bandwan Block under Purulia Piped Water Supply Scheme (Southern Sector) under Purulia Divn. PHE Dte. (3rd Call) ORD/002260/2023-2024 146/PD 29/01/2024 270 ANUP KUMAR SAHA 247.75 0.00 0 0
25 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Construction of Boundary wall & Sinking of T/well at Manbazar-II,Zone-II under Purulia W/S Scheme under Purulia Sadar Sub Division under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer-2 ORD/003527/2023-2024 353/PD 04/03/2024 60 PRIYATOSH MUKHERJEE 20.95 0.00 0 0
26 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Division PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Material Requisition To Resource Division RTOR000004/2023-2024 1128/PD 17/08/2023 Resource Division 8,279.54 0.00 0 0
27 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Voltage Stabilizer and allied works for different OHR sites at Bagmundi Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000095/2024-2025 1053/PMD 28/06/2024 365 DAS ENTERPRISE 50.63 0.00 0 0
28 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Voltage Stabilizer and allied works for different OHR sites at Balarampur Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000096/2024-2025 1054/PMD 28/06/2024 365 M/S S.G.ENTERPRISE 31.65 0.00 0 0
29 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Voltage Stabilizer and allied works for different OHR sites at Bandwan Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000097/2024-2025 1055/PMD 28/06/2024 365 ANUP KUMAR SAHA 50.65 0.00 0 0
30 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Voltage Stabilizer and allied works for different OHR sites at Manbazar-II Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000098/2024-2025 1056/PMD 28/06/2024 365 RABINDRA NATH KHAN 25.32 0.00 0 0
31 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Disinfection arrangement and Illumination arrangement for OHR sites, at Balarampur Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER ORD/000513/2023-2024 515/PMD 15/03/2024 365 COMBINE ENTERPRISES 154.79 0.00 0 0
32 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Disinfection arrangement and Illumination arrangement for OHR sites, at Bandwan Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER ORD/000514/2023-2024 516/PMD 15/03/2024 365 GOENKA ENTERPRISE 258.09 0.00 0 0
33 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Disinfection arrangement and Illumination arrangement for OHR sites, at Manbazar-II Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER ORD/000515/2023-2024 517/PMD 15/03/2024 365 SINHA ELECTRICALS 206.55 0.00 0 0
34 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Diaphragm type Automatic Chlorinator and Illumination arrangement for OHR sites at Bagmundi Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER ORD/000518/2023-2024 479/PMD 14/03/2024 365 SUBRATA DUTTA 69.61 0.00 0 0
35 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Diaphragm type Automatic Chlorinator and Illumination arrangement for OHR sites at Balarampur Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER ORD/000519/2023-2024 480/PMD 14/03/2024 365 ELECTRICAL AND MECHANICAL ENGINEERING CORPORATION 69.58 0.00 0 0
36 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Diaphragm type Automatic Chlorinator and Illumination arrangement for OHR sites at Bandwan Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER ORD/000520/2023-2024 481/PMD 14/03/2024 365 RABINDRA NATH KHAN 109.36 0.00 0 0
37 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Supply Delivery and Installation of Diaphragm type Automatic Chlorinator and Illumination arrangement for OHR sites at Manbazar-II Block for PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE-II for Purulia District under Purulia Mechanical Division, P.H.E. Dte. DRILLER-IN-CHARGE IN THE RANK OF ASSISTANT ENGINEER ORD/000521/2023-2024 482/PMD 14/03/2024 365 M/S D.G.B.ENTERPRISE 39.77 0.00 0 0
38 PURULIA Arsha,Bagmundi,Balarampur,Bundwan,Manbazar - I,Manbazar - II,Purulia - I Purulia Mechanical PURULIA WATER SUPPLY PROJECT SOUTHERN SECTOR PHASE - II , SM/18641 New Internal and external illumination with other allied works at Satra high lift(Boosting station) and low lift for augmentation of Satra water supply scheme under PMD, PHE Dte. In the district of Purulia. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000567/2024-2025 1357/PMD 12/09/2024 60 GOLAP KR. GHOSH 4.88 0.00 0 0
Total 59,047.81 591.89 1