Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6 | 36,693.36 | 722.45 | 1.97 | ||||||||||||||
1 | PURULIA | Hura,Jaipur,Jhalda - I,Jhalda - II,Kashipur,Manbazar - I,Neturia,Para,Puncha,Purulia - I,Purulia - II,Raghunathpur - I,Raghunathpur - II,Santuri | Purulia Division | Surface water based piped water supply scheme for Purulia District (Northern sector) (Phase-I) , SM/18528 | New | Electric quotation along with M.B No1200/PMD for payment of shifting of 11KV PHE feeder & 11 KV Rampur feeder from Northern Sector WTP Campus for payment from your end. | BILL/01971/2023-2024 | BP-2023-24-889 | 18/03/2024 | WBSEDCL | 45.82 | 0.00 | 0 | 0 | |||
2 | PURULIA | Hura,Jaipur,Jhalda - I,Jhalda - II,Kashipur,Manbazar - I,Neturia,Para,Puncha,Purulia - I,Purulia - II,Raghunathpur - I,Raghunathpur - II,Santuri | Purulia Division | Surface water based piped water supply scheme for Purulia District (Northern sector) (Phase-I) , SM/18528 | New | Details survey of WTP site as well as intake site to ascertion depth and area basin at Shiulibari Mouza, Nituria Block under Northern Zone W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/000020/2023-2024 | 549/PD | 12/04/2023 | 30 | ROY CHOWDHURY ASSOCIATES | 5.39 | 2.69 | 49.91 | 100 |
3 | PURULIA | Hura,Jaipur,Jhalda - I,Jhalda - II,Kashipur,Manbazar - I,Neturia,Para,Puncha,Purulia - I,Purulia - II,Raghunathpur - I,Raghunathpur - II,Santuri | Purulia Division | Surface water based piped water supply scheme for Purulia District (Northern sector) (Phase-I) , SM/18528 | New | Construction and Commissioning of RCC Over Head Reservoir ( Torch type with solid raft ) of capacity 150 CUM and staging height 20 mtr as per approved drawing ( No:PC-I/OHR/3/2012) including Laying Distribution Pipe Line and providing FHTC including other allied works & Operation & Maintenance of Distribution , Pipe line (DI/HDPE), including Sluice Valve & FHTC for the period of thirty six month (36) for Zone-II of Kashipur Block under Purulia Piped Water Supply Scheme (Northern Sector) under Purulia Divn. PHE Dte. (SL-2) | Assistant Engineer | Junior Engineer | ORD/000895/2023-2024 | 1560/PD | 18/10/2023 | 270 | RAJ BROTHERS | 264.65 | 44.41 | 16.78 | 22 |
4 | PURULIA | Hura,Jaipur,Jhalda - I,Jhalda - II,Kashipur,Manbazar - I,Neturia,Para,Puncha,Purulia - I,Purulia - II,Raghunathpur - I,Raghunathpur - II,Santuri | Purulia Division | Surface water based piped water supply scheme for Purulia District (Northern sector) (Phase-I) , SM/18528 | New | Design, Surveying, Engineering, Supplying, Construction, Erection, Installation, Testing And Commissioning Of Fixed Type Intake Jetty With Pump House, Construction Of Subs Stations; Raw Water Rising Main, Bank Protection, 158 MLD (Minimum) Capacity Water Treatment Plant (WTP) Based On Conventional Technologies Considering Extra 20% Overloading; at Siulibari Mouza of Neturia Block to supply water for 14 nos. Block Including Pumping Machineries On EPC/Turnkey Basis In A Single Package (Package-1) Including 3 (Three) Months Trial Run And Operation & Maintenance For 3 Years For Surface Based W/S Scheme For Northern Sector Under Purulia District. | Assistant Engineer | Junior Engineer | ORD/000897/2023-2024 | 1563/PD | 26/10/2023 | 640 | GAJA ENGINEERING PRIVATE LIMITED | 36,300.00 | 673.00 | 1.85 | 6 |
5 | PURULIA | Hura,Jaipur,Jhalda - I,Jhalda - II,Kashipur,Manbazar - I,Neturia,Para,Puncha,Purulia - I,Purulia - II,Raghunathpur - I,Raghunathpur - II,Santuri | Purulia Division | Surface water based piped water supply scheme for Purulia District (Northern sector) (Phase-I) , SM/18528 | New | Construction of Boundary wall, RCC Pillar, gate, Barbed wire & Sinking of 2(Two) nos tubewellat OHR Sites of Zone - V & VI of Hura Block under Surface Water Based Piped Water Supply Scheme for Purulia District (Northern Sector) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (Total Length of Boundary Wall: 270 m). | Assistant Engineer | Junior Engineer-4 | ORD/001825/2023-2024 | 63/PD | 10/01/2024 | 60 | SUBHAS CHANDRA MAHATO | 37.70 | 2.35 | 6.23 | 20 |
6 | PURULIA | Hura,Jaipur,Jhalda - I,Jhalda - II,Kashipur,Manbazar - I,Neturia,Para,Puncha,Purulia - I,Purulia - II,Raghunathpur - I,Raghunathpur - II,Santuri | Purulia Division | Surface water based piped water supply scheme for Purulia District (Northern sector) (Phase-I) , SM/18528 | New | Construction of Boundary wall, RCC Pillar, gate, Barbed wire & Sinking of 2(Two) nos tubewellat OHR Sites of Zone - VII & VIII of Hura Block under Surface Water Based Piped Water Supply Scheme for Purulia District (Northern Sector) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte.(Total Length of Boundary Wall:290 m) | ORD/001826/2023-2024 | 64/PD | 10/01/2024 | 60 | GHOSH AND ROY ENTERPRISE | 39.80 | 0.00 | 0 | 0 | ||
Total | 36,693.37 | 722.44 | 1.97 |