Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
35 1,251.18 606.82 48.5  
1 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Making Xerox copy of original DPR, Drawing, Mouza Map etc. BILL/00248/2023-2024 27/2023-149 30/05/2023 SB CONSTRUCTION 0.37 0.00 0 0
2 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Construction of Toilet, Repairing of Guard Room & Remaining work of Pump House (Phase-II) at Sarbari under Sarbari W/S Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer-1 ORD/000139/2024-2025 910/PD 07/05/2024 60 AMIT PATHAK 7.10 0.00 0 0
3 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Crossing of PWD Road and laying of additional HDPE pipe line(75mm & 63mm) with allied work (Zone-I) under Sarbari W/S Scheme within Raghunathpur Sub-Division under Purulia Division,PHEDte. Assistant Engineer Junior Engineer-1 ORD/000212/2024-2025 1080/PD 07/06/2024 45 JAYANTA KUMAR MONDAL 33.85 0.00 0 0
4 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Laying of DI(k-9) pipe and other allied works for rising main under Sarbari W/S Scheem within Raghunathpur Sub-Division under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000310/2022-2023 844/PD 23/05/2022 45 KHITISH CHANDRA PATHAK 30.86 16.93 54.86 80
5 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation New Sinking of 2 (Two) nos. 200 mm dia river bed vertical tubewell alongwith necessary 100 mm dia GI collecting line from River bed Tubewell to common manifold chamber at river bank (Damodar River) at Chinakuri ghat under Sarbari W/S Scheme under Raghunathpur Sub Division, PHE Dte. [Part-A] Assistant Engineer ORD/000320/2022-2023 853/PD 23/05/2022 30 KHITISH CHANDRA PATHAK 7.79 6.77 86.91 90
6 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation New Sinking of 2 (Two) nos. 200 mm dia river bed vertical tubewell alongwith necessary 100 mm dia GI collecting line from River bed Tubewell to common manifold chamber at river bank (Damodar River) at Chinakuri ghat under Sarbari W/S Scheme under Raghunathpur Sub Division, PHE Dte. [Part-B] Assistant Engineer ORD/000321/2022-2023 854/PD 23/05/2022 30 KHITISH CHANDRA PATHAK 7.79 2.13 27.34 95
7 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Construction of Pump House (10 X 7 mtr) at Head Work site under Sarbari W/S Scheme of Raghunathpur Sub-Divn under Purulia Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000332/2022-2023 863/PD 23/05/2022 100 M/S SHYAMASHREE ENTERPRISE 15.57 6.77 43.48 100
8 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supplying, laying different dia HDPE pipe including Functional House Hold Tap Connection (FHTC) for Distribution System (Zone-II) of Sarbari W/S Scheme under Raghunathpur Sub-Division under Purulia Division, PHE Dte. (Mouza-Neturia, Pathardiha, Kuthibari, Nawada) Assistant Engineer Junior Engineer ORD/000365/2022-2023 868/PD 23/05/2022 60 KHITISH CHANDRA PATHAK 72.90 63.10 86.56 75
9 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Soil Investigation for determination the safe bearing capacity and other relevant parameters of soil for construction of O.H.R. at Sarbari W/S Scheme within Raghunathpur Sub-Division of Purulia Division P.H.E Dte. Assistant Engineer ORD/000402/2022-2023 341/RNP 01/06/2022 30 K.S.GROUP 1.40 1.40 100 100
10 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supplying, laying different dia HDPE and DI pipe including Functional House Hold Tap Connection (FHTC) for Distribution System (Zone-I) of Sarbari W/S Scheme under Raghunathpur Sub-Division under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000411/2022-2023 984/PD 22/06/2022 45 JAYANTA KUMAR MONDAL 356.05 279.86 78.6 85
11 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Withdrawing and new laying of necessary M.S. carrier pipe and all allied works at Ramkanali Ranipur village Railway Track at Erekusum village and new sinking of 2(two) no. 200 mm dia. River bed vertical at River Damodar with supplying and laying 100 mm dia GI collecting line from Riverbed Tubewell to CWR through common manifold chamber at river bank and execution of additional works for construction of (10.0 mtr x 7.0) mtr pump house drain, plinth protection under Saltora-Hijuli Under Sarbari W/S Scheme under Raghunathpur Sub Division, PHE Dte. ORD/000466/2024-2025 1523/PD 27/08/2024 15 M/S SAYAK BHATTACHARYA 43.79 0.00 0 0
12 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Laying of HDPE pipe (PE-100, PN-10) for collecting line of riverbed Tubewell (for 3 & 4) under Sarbari W/S Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000661/2023-2024 1354/PD 13/09/2023 30 KHITISH CHANDRA PATHAK 5.56 2.77 49.82 100
13 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Construction and Commissioning of RCC Over Head Reservoir (Intze type with solid raft) of capacity 400 cum and staging height 20 mtr. with including supply of all labour & materials for Sarbari W/S Scheme within Raghunathpur Sub-Division of Purulia Division P.H.E Dte. Assistant Engineer Junior Engineer ORD/000922/2022-2023 1889/PD 15/12/2022 270 MD AAMIR KHAN 131.92 72.32 54.82 100
14 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Construction of Pump House (9 mtr X 4 mtr) at Boosting Station (Phase-II) under Sarbari W/S Scheme of Raghunathpur Sub-Divn under Purulia Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000968/2022-2023 47/PD 09/01/2023 100 AMIT PATHAK 10.66 10.44 97.94 100
15 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Repairing and renovation of low-lift Pump House at River Side including drain under Sarbari W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001086/2022-2023 97/RNP 13/03/2023 15 AMIT PATHAK 0.97 0.96 98.97 0
16 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Road Crossing of rising main by jack pushing at Panchyet Road under Sarbari W/S Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer ORD/003964/2023-2024 507/PD 16/03/2024 60 KHITISH CHANDRA PATHAK 9.36 8.85 94.55 100
17 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Laying of HDPE pipe line (75mm & 63mm) with additional Functional Household Tap Connection (FHTC) of distribution system (Zone-I) under Sarbari W/S Scheme within Raghunathpur Sub-Division under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer-1 ORD/003977/2023-2024 522/PD 16/03/2024 60 JAYANTA KUMAR MONDAL 32.71 25.57 78.17 0
18 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Laying of HDPE pipe line (75mm & 63mm) and supplying of DI specials with additional Functional Household Tap Connection (FHTC) of distribution system (Zone-I) under Sarbari W/S scheme within Raghunathpur Sub-Division under Purulia Division, PHE Dte. Assistant Engineer Junior Engineer-1 ORD/003978/2023-2024 523/PD 16/03/2024 60 JAYANTA KUMAR MONDAL 30.53 11.93 39.08 0
19 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supply fitting fixing D.I Specials for 200 MM dia D.I Rising Main under Sarbari W/S Scheme under Raghunathpur Sub-Division under Purulia Division P.H.E Dte. Assistant Engineer Junior Engineer ORD/003979/2023-2024 524/PD 16/03/2024 45 KHITISH CHANDRA PATHAK 4.75 1.66 34.95 100
20 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Laying of different dia HDPE Pipe line and Road crossing for additional work at Sarbori distribution line (Zone-II) under Sarbari W/S Scheme of Raghunathpur Sub-Division under Purulia Division PHE Dte. Assistant Engineer Junior Engineer ORD/003980/2023-2024 525/PD 16/03/2024 60 KHITISH CHANDRA PATHAK 15.10 9.47 62.72 100
21 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Construction of RCC Clear water reservoir (CWR) of capacity 100 Cum with other allied works at Boosting Station under Sarbari W/S Scheme (Phase-II) of Raghunathpur Sub-Division under Purulia Division, PHE Dte. ORD/003982/2023-2024 528/PD 16/03/2024 90 AMIT PATHAK 18.35 0.00 0 0
22 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Material Requisition To Resource Division RTOR000022/2022-2023 978/PD 22/06/2022 Resource Division 239.56 0.00 0 0
23 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation New sinking of 02 (Two) No. 200 mm dia river bed vertical tube well T/W no- 3&4 along with necessary 100 mm dia GI collecting line in connection with FHTC from river bed tube well to common manifold chamber at river bank (Damodar river) at Chinakuri Ghat under Sarbari Water Supply Scheme under Raghunathpur Sub- Division, PHE dte.(Tender No- 744/2021-22 of EE/PD) VCH/000958/2022-2023 BP-2022-23-131 19/07/2022 ASHOK KUMAR CHATTERJEE 5.05 0.00 0 0
24 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Continuation work order for Preparation of DPR (consultancy work) in connection with the Functional Household Connection of different existing PWSS (Sarbari W/S Scheme block- Neturia) to be augmented/ Retrofitting under Purulia Division, PHE Dte. (Tender No- 972/2021-22 of EE/PD) VCH/000967/2022-2023 BP-2022-23-141 19/07/2022 HORIZEN 2.35 0.00 0 0
25 PURULIA Purulia Division Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Preparation of DPR (consultancy work) in connection with the Functional Household Connection of different existing PWSS (Sarbari W/S Scheme block- Neturia) to be augmented/ Retrofitting under Purulia Division, PHE Dte. (Tender No- 542/2021-22 of EE/PD) VCH/000968/2022-2023 BP-2022-23-134 19/07/2022 HORIZEN 4.09 0.00 0 0
26 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation QUATATION FOR SHIFTING OF TRANSFORMER BILL/00476/2023-2024 BP-23-24-238 13/12/2023 WBSEDCL PURULIA 2.36 0.00 0 0
27 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supply delivery and fitting fixing of the luminaries external and internal lighting with others allied works for Augmentation at SARBARI (Phase-1) w/s scheme under PMD, PHE Dte. in the District of Purulia. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2023-2024 644/PMD 08/06/2023 30 AVISHEK ENTERPRISE 6.27 6.27 100 100
28 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supply delivery and fitting fixing of the luminaries external and internal lighting with others allied works for Rejuvenation at SARBARI (Phase-2) w/s scheme under PMD, PHE Dte. in the District of Purulia.. JUNIOR ENGINEER ORD/000117/2023-2024 645/PMD 08/06/2023 30 SANTU MITRA 4.40 3.99 90.68 50
29 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supply, Delivery and installation of Centrifugal pumping machineries, MCC Panels with others allied works for rejuvenation at SARBARI PHASE-2 w/s scheme under PMD, PHE Dte. in the District of Purulia. (2 nd Call) ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000185/2023-2024 1175/PMD 03/11/2023 120 R.N.S. TRADING 41.91 0.00 0 0
30 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supply and installation of 2 MT Capacity single girder H.O.T Crane with gantry girder and square rail for Sarbori Phase-1 Water Supply Scheme. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000201/2023-2024 1191/PMD 03/11/2023 60 SEN BROTHERS 9.71 9.28 95.57 100
31 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supply and installation of 2 MT Capacity single girder H.O.T Crane with gantry girder and square rail for Sarbori Phase-2 Water Supply Scheme. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000202/2023-2024 1192/PMD 03/11/2023 60 P K ENGINEERING 11.49 0.00 0 0
32 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supply delivery installation of 1kg/hr gaseous chlorination system at Augmentation of Sarbari Water Supply scheme Neturia Block under PMD PHE Dte. District Purulia. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000292/2022-2023 84/PMD 01/02/2023 60 GHOSE ENGINEERING SYNDICATE 21.61 16.33 75.57 100
33 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supply, delivery and installation of Centrifugal pumping machineries, MCC Panel, Flowmeter with others allied works for Augmentation at SARBARI PHASE-1 w/s scheme under PMD, PHE, Dte. in the District of Purulia JUNIOR ENGINEER ORD/000309/2022-2023 97/PMD 03/02/2023 60 GOENKA ENTERPRISE 49.77 40.16 80.69 100
34 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Supply, delivery and installation of 4 nos. submersible pumps motor sets at newly constructed riverbed tubewell with other allied works for Augmentation at SARBARI PHASE-1 w/s scheme under PMD, PHE Dte. in the District of Purulia. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000310/2022-2023 98/PMD 03/02/2023 60 AVISHEK ENTERPRISE 12.13 9.86 81.29 0
35 PURULIA Purulia Mechanical Sarbari Piped Water Supply Scheme to Accommodate FHTC , SM/10720 Augmentation Material Requisition To Resource Division RTOR000008/2023-2024 617/PMD 01/06/2023 Resource Division 3.10 0.00 0 0
Total 1,251.17 606.83 48.5