Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 207.26 77.5 37.39  
1 BANKURA Bankura Division Augmentation works for CHINABARI (Zone - H) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project). , SM/17705 Augmentation Construction of Pump House including plinth protection, Ramp etc. according to departmental design & drawing in connection with Jal Jeevan Mission (JJM) for Augmentation of CHINGANI and adjoining mouzas W/S Scheme under ONDA Water supply scheme (BRGF ph - I project) under Bankura Sadar Sub - Division of Bankura Division, PHE Dte. Assistant Engineer ORD/000349/2024-2025 2344/BQA 09/09/2024 90 GON ASSOCIATES 22.54 0.00 0 0
2 BANKURA Bankura Division Augmentation works for CHINABARI (Zone - H) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project). , SM/17705 Augmentation Creation of Balance FHTC (Functional House Hold Tap Connection), construction of platform with allied works, Construction of Pump House and 100 Cum. CWR for Augmentation of Chinabari (Zone - H) under Saltora- Chhatna Block W/S Scheme (BRGF ph - I project) under Bankura Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000405/2023-2024 2092/BQA 27/07/2023 270 MADHU SUDAN RAKSHIT 177.01 77.50 43.78 62
3 BANKURA Bankura Division Augmentation works for CHINABARI (Zone - H) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project). , SM/17705 Augmentation Support service for detail surveying, cross checking of abailable LOP and taking level at the interval of 50 mtr. by using Survey Instrument like DGPS / Drone and detailed design of pipe line by using Watergems Software on the basis of population density for Augmentation works for Chinabari (Zone-H) under Saltora- Chhatna water Supply Scheme (BRGF Ph-I project) of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000847/2023-2024 2973/BQA 31/10/2023 30 MEASURE LAND 2.09 0.00 0 1
4 BANKURA Bankura Division Augmentation works for CHINABARI (Zone - H) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project). , SM/17705 Augmentation Material Requisition To Resource Division RTOR000140/2023-2024 2732/BQA 03/10/2023 Resource Division 2.81 0.00 0 0
5 BANKURA Bankura Division Augmentation works for CHINABARI (Zone - H) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project). , SM/17705 Augmentation Material Requisition To Resource Division RTOR000245/2023-2024 193/BQA 22/01/2024 Resource Division 2.81 0.00 0 0
Total 207.26 77.50 37.39