Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 478.15 96.78 20.24  
1 BANKURA Bankura Division 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Construction of Pump House at CWR site for Augmentation of Dhaban (Zone - A) under Saltora- Chhatna Block W/S Scheme (BRGF Ph - I project) under Bankura Division, P.H.E. Dte. Assistant Engineer ORD/000694/2023-2024 2640/BQA 21/09/2023 90 SRIKANTA MONDAL 18.91 0.00 0 0
2 BANKURA Bankura Division 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Construction of 200 Cum. Clear Water Reservoir with allied works for Augmentation of Dhaban (Zone - A) under Saltora- Chhatna Block W/S Scheme (BRGF Ph - I project) under Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000695/2023-2024 2641/BQA 21/09/2023 211 RUFIKUL MONDAL 43.90 0.00 0 0
3 BANKURA Bankura Division 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Construction of Boundary wall for Augmentation of Dhaban (Zone - A) under Saltora- Chhatna Block W/S Scheme (BRGF Ph - I project) under Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000696/2023-2024 2642/BQA 21/09/2023 60 M/S SUPRIYA CHATTERJEE 18.14 0.00 0 2
4 BANKURA Bankura Division 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Support service for detail surveying, cross checking of abailable LOP and taking level at the interval of 50 mtr. by using Survey Instrument like DGPS / Drone and detailed design of pipe line by using Watergems Software on the basis of population density for Augmentation works for Dhaban (Zone-A) under Saltora- Chhatna water Supply Scheme (BRGF Ph-I project) of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000845/2023-2024 2971/BQA 31/10/2023 30 MEASURE LAND 2.98 0.00 0 1
5 BANKURA Bankura Division 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Distribution of Pipeline and Creation of Balance FHTC (Functional House Hold Tap Connection) for Augmentation of Dhaban (Zone - A) under Saltora- Chhatna Block W/S Scheme (BRGF Ph - I project) under Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000864/2023-2024 3020/BQA 03/11/2023 60 M/S BIPUL BANERJEE 78.59 14.37 18.28 6
6 BANKURA Bankura Division 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Material Requisition To Resource Division RTOR000007/2023-2024 1120/BQA 12/05/2023 Resource Division 12.64 0.00 0 0
7 BANKURA Bankura Division 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Material Requisition To Resource Division RTOR000136/2023-2024 2732/BQA 03/10/2023 Resource Division 4.39 0.00 0 0
8 BANKURA Bankura Division 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Material Requisition To Resource Division RTOR000148/2023-2024 3467/BQA 20/12/2023 Resource Division 11.89 0.00 0 0
9 BANKURA Bankura Division 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Material Requisition To Resource Division RTOR000250/2023-2024 193/BQA 22/01/2024 Resource Division 4.39 0.00 0 0
10 BANKURA Bankura Mechanical 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' BILL/00128/2023-2024 null 28/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.50 0.00 0 0
11 BANKURA Bankura Mechanical 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation New service connection for DHABAN water supply scheme under BMD PHE Dte. (SM code : SM/17702) BILL/00429/2024-2025 BP-2024-25-105 21/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 6.01 0.00 0 null
12 BANKURA Bankura Mechanical 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Acceptance cum Formal work order for the work of Supply delivery and fitting fixing of Pump spares of HSC pumps at Intermediate Boosting pumping station(IBS) and sub-station equipments at Upargora under Chhatna, Saltora Block Sub-Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under Bankura Mechanical Division, P.H.E. Dte. Block: Saltora, Dist- Bankura Assistant Engineer Junior Engineer ORD/000338/2023-2024 1470/BMD 18/07/2023 60 DAS ENTERPRISE 173.06 82.41 47.62 70
13 BANKURA Bankura Mechanical 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Acceptance cum Formal work order for the work of Replacement of Valves on delivery line at Intermediate Boosting pumping station(IBS) at Upargora under Chhatna, Saltora Block Sub-Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under Bankura Mechanical Division, P.H.E. Dte. Block: Saltora, Dist- Bankura for Augmentation work Dhaban( Zone-A) under Saltora-Chhatna Water supply scheme (BRGF Phase-I) ORD/000612/2023-2024 2086/BMD 12/09/2023 120 DAS ENTERPRISE 17.65 0.00 0 0
14 BANKURA Bankura Mechanical 'Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme (BRGF Ph - I Project).' , SM/17702 Augmentation Acceptance cum Formal work order for the work of Providing and installation of pumping machinery and other electromagnetically accessories for Augmentation works DHABAN (Zone - A) under Saltora- Chhatna Water Supply Scheme PWS Scheme under Bankura Mechanical Division PHE Dte. Dist: Bankura. Assistant Engineer Junior Engineer ORD/001089/2023-2024 3064/BMD 12/03/2024 120 WEST BENGAL ENGINEERING CO. 84.10 0.00 0 0
Total 478.15 96.77 20.24