Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 146.85 0 0  
1 BANKURA Bankura Division Augmentation of piped water supply schemes for Kenjakura and its adjoining mouzas (Phase - I). , SM/17441 Augmentation Balance allied works of Augmentation of piped water supply schemes for Kenjakura and its adjoining mouzas (phase-I) under Bankura Sadar Sub-Division of BANKURA Division, P.H.E. Dte. Assistant Engineer ORD/000167/2024-2025 1808/BQA 11/07/2024 120 M/S TARUN KUMAR PATRA 123.21 0.00 0 0
2 BANKURA Bankura Division Augmentation of piped water supply schemes for Kenjakura and its adjoining mouzas (Phase - I). , SM/17441 Augmentation Support service for detail surveying, cross checking of available LOP and taking level at the interval of 50 mtr. by using survey instrument like DGPS / Drone and detailed design of pipeline by using Watergems Software on the basis of population density for Augmentation of piped water supply schemes for Kenjakura and its adjoining mouzas (Phase - I). under Bankura Sadar Sub Division of Bankura Division, PHE Dte. Assistant Engineer ORD/001190/2023-2024 442/BQA 08/02/2024 30 LEMNISCATE 1.23 0.00 0 0
3 BANKURA Bankura Division Augmentation of piped water supply schemes for Kenjakura and its adjoining mouzas (Phase - I). , SM/17441 Augmentation Material Requisition To Resource Division RTOR000123/2023-2024 2732/BQA 03/10/2023 Resource Division 1.32 0.00 0 0
4 BANKURA Bankura Division Augmentation of piped water supply schemes for Kenjakura and its adjoining mouzas (Phase - I). , SM/17441 Augmentation Material Requisition To Resource Division RTOR000265/2023-2024 193/BQA 22/01/2024 Resource Division 1.32 0.00 0 0
5 BANKURA Bankura Mechanical Augmentation of piped water supply schemes for Kenjakura and its adjoining mouzas (Phase - I). , SM/17441 Augmentation Augmentation of piped water supply schemes for Kenjakura and its adjoining mouzas (Phase - I). BILL/00191/2023-2024 null 28/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.50 0.00 0 0
6 BANKURA Bankura Mechanical Augmentation of piped water supply schemes for Kenjakura and its adjoining mouzas (Phase - I). , SM/17441 Augmentation Acceptance cum Formal work order for the work of Providing and installation of Low Lift pumping machinery and other electro mechanical accessories for Augmentation of piped water supply scheme for Kenjakura and its adjoining Mouzas water supply scheme under Bankura Mechanical Division PHE Dte, Dist: Bankura. Assistant Engineer Junior Engineer ORD/001090/2023-2024 3065/BMD 12/03/2024 120 SWAPAN ENTERPRISE 18.27 0.00 0 100
Total 146.84 0.00 0