Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 475.49 42.53 8.94  
1 BANKURA Bankura Division Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation Work order for Laying of HDPE pipeline, Construction of Valve Chamber, Construction of Boundary wall at Tubewell site for Augmentation of Water Supply Scheme for Gargaria, Zone-B and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission under Khatra Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000165/2024-2025 1829/BQA 12/07/2024 90 SWAPAN KUMAR CHANDRA 62.38 0.00 0 0
2 BANKURA Bankura Division Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation Sinking of 2 Nos. 300 mm X 200 mm X 300 m deep Tubewell by Rig boring method including interconnection with 100 mm dia. G.I. Pipe and Construction & commissioning of ¿FHTC (Functional House Hold Tap Connection)¿ and Construction of 2 Nos.Pump Houses with ancillary works in different mouzas for Augmentation of Water Supply Scheme for Gargaria, Zone-B and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission under Khatra Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000337/2023-2024 1961/BQA 18/07/2023 270 PRINCE INDUTRIES (INDIA) 221.68 33.28 15.01 20
3 BANKURA Bankura Division Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation Support service for detail surveying, cross checking of abailable LOP and taking level at the interval of 50 mtr. by using Survey Instrument like DGPS / Drone and detailed design of pipe line by using Watergems Software on the basis of population density for Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme under Khatra Sub Division of Bankura Division, P.H.E. Dte. Assistant Engineer ORD/000833/2023-2024 2959/BQA 31/10/2023 30 MEASURE LAND 2.95 1.45 49.15 98
4 BANKURA Bankura Division Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation Material Requisition To Resource Division RTOR000183/2023-2024 116/BQA 10/01/2024 Resource Division 2.77 0.00 0 0
5 BANKURA Bankura Mechanical Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme BILL/00214/2023-2024 null 28/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.50 0.00 0 0
6 BANKURA Bankura Mechanical Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation New Service Connection for Gargaria water supply scheme under Bankura Mechanical Division PHE Dte. BILL/00382/2024-2025 BP-2024-25-86 11/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.18 0.00 0 null
7 BANKURA Bankura Mechanical Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation New 3 Phase Service Connection for Gargaria Zone B BILL/00700/2024-2025 null 01/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.18 0.00 0 null
8 BANKURA Bankura Mechanical Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation Acceptance cum Formal work order for the work of Construction of Guard Piller for cable laying of river bed T/W with allied works for Gargaria Zone-A and Adjoining mouza for Augmentation works for Gargariya zone A water supply scheme under sarenga water supply scheme (BRGF ph 1) under jal jeevan mission programme under Bankura Mechanical Division, P.H.E. Dte Driller-in-Charge Junior Engineer ORD/000320/2024-2025 861/BMD 29/08/2024 120 PRADIP KUMAR DHABAL 11.13 0.00 0 0
9 BANKURA Bankura Mechanical Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation Acceptance cum Formal work order for the work of Providing, installation of Pumping machineries with other electro-mechanical accessories for Augmentation works for Gargariya Zone-B water supply scheme under Sarenga water supply scheme (BRGF Ph-I) under Jal Jeevan Mission Programme under Bankura Mechanical Division, PHE Dte, Dist: Bankura Assistant Engineer,Driller-in-Charge Junior Engineer ORD/000575/2023-2024 2030/BMD 01/09/2023 120 TAPAN KUMAR DEY 61.70 0.00 0 0
10 BANKURA Bankura Mechanical Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation Acceptance cum Formal work order for the work of Providing and installation of submersible pumping machineries for Augmentation for Gargariya Zone A water supply scheme under Sarenga water supply scheme (BRGF Ph I) under Jal Jeevan Mission progremme under Bankura Mechanical Division PHE Dte, Dist :Bankura Assistant Engineer,Driller-in-Charge Junior Engineer ORD/001036/2023-2024 2968/BMD 29/02/2024 180 M/S S.S. ENTERPRISE(MURSHIDABAD) 37.80 7.80 20.63 40
11 BANKURA Bankura Mechanical Augmentation works for Gargariya, Zone-B Water Supply Scheme under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme , SM/17438 Augmentation Acceptance cum Formal work order for the work of Providing and installation of HL Pumping machineries & MCC panel with other electromechanical accessories for Augmentation for Gargariya Zone-B and adjoining mouzas under Sarenga water supply scheme (BRGF Ph-I) under Jal Jeevan Mission progremme under Bankura Mechanical Division PHE Dte, Dist :Bankura. Driller-in-Charge Junior Engineer ORD/001095/2023-2024 3070/BMD 12/03/2024 120 DEBJYOTI BASU 67.22 0.00 0 0
Total 475.47 42.53 8.94