Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
16 866.54 275.11 31.75  
1 BANKURA Bankura Division Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Crossing of Road at different location by Jack pushing method (600 mm dia RCC Hume pipes for casing pipe) for Distribution Main for Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme under Khatra Sub-Division under Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000077/2024-2025 1497/BQA 18/06/2024 30 SWAPAN KUMAR CHANDRA 17.80 0.00 0 0
2 BANKURA Bankura Division Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Sinking 3 Nos 300x200 Rig Bore Tubewell, Construction of 250 Cum OHR, 3 Nos. Pump House, Boundary Wall, Rising Main and Construction & commissioning of ¿FHTC (Functional House Hold Tap Connection)¿ in different mouzas for Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission under Khatra Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000475/2023-2024 2330/BQA 14/08/2023 270 PRINCE INDUTRIES (INDIA) 566.03 247.60 43.74 55
3 BANKURA Bankura Division Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Supplying, laying, fiting, fixing and jointing by HDPE pipe for Distribution Main along with making MS Tee and ancillary works at Baraamjhor village due to Strengthening - Widening of road from Pirorgari More to Brahamandiha by PWD (Roads) Dte. under Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Khatra Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000638/2023-2024 2580/BQA 15/09/2023 30 SANJOY PATRA 4.02 2.00 49.75 50
4 BANKURA Bankura Division Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Support service for detail surveying, cross checking of abailable LOP and taking level at the interval of 50 mtr. by using Survey Instrument like DGPS / Drone and detailed design of pipe line by using Watergems Software on the basis of population density for Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme under Khatra Sub Division of Bankura Division, P.H.E. Dte. Assistant Engineer ORD/000835/2023-2024 2961/BQA 31/10/2023 30 GEO SOLUTION 4.45 2.23 50.11 96
5 BANKURA Bankura Division Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Soil Investigation work for the proposed construction of RCC Over Head Reservoir under Bankura Sadar Sub- Division & Khatra Sub- Division of Bankura Division, P.H.E. Dte. (2nd Call) Assistant Engineer Junior Engineer ORD/000861/2023-2024 2953/BQA 31/10/2023 60 K S GROUP 5.18 0.00 0 0
6 BANKURA Bankura Division Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Sinking of 3 Nos. 300 mm X 200 mm X 200 Metre deep Tubewell (Replacement) by Rig boring method including interconnection with 100 mm dia. G.I. Pipe for Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer ORD/001298/2023-2024 809/BQA 07/03/2024 45 ANJAN INFRASTUCTURE PVT LTD. 50.34 23.28 46.25 98
7 BANKURA Bankura Division Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Material Requisition To Resource Division RTOR000010/2023-2024 1120/BQA 12/05/2023 Resource Division 60.93 0.00 0 0
8 BANKURA Bankura Mechanical Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation New service connection for Kuldiha water supply scheme under Bankura Mechanical Division PHE Dte. BILL/00029/2024-2025 BP-2024-25-12 10/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.75 0.00 0 null
9 BANKURA Bankura Mechanical Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation New service connection for Kuldiha water supply scheme under Bankura Mechanical Division PHE Dte. BILL/00122/2024-2025 BP-2024-25-13 10/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.23 0.00 0 null
10 BANKURA Bankura Mechanical Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Augmentation works for Kadra (Zone- G) under Khatra-Hirbandh-Ranibandh Water Supply Scheme (BRGF Ph - I) BILL/00218/2023-2024 null 28/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.50 0.00 0 0
11 BANKURA Bankura Mechanical Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation New service connection charges for Kuldihi, Application No- 2004835893 BILL/00701/2024-2025 null 01/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 6.31 0.00 0 null
12 BANKURA Bankura Mechanical Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation New Service Connection for Kuldihi , Application No- 2004835760 BILL/00702/2024-2025 null 01/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.75 0.00 0 null
13 BANKURA Bankura Mechanical Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation New Service connection charge of WBSEDCL Kuldiha BILL/00703/2024-2025 null 01/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.23 0.00 0 null
14 BANKURA Bankura Mechanical Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Acceptance cum Formal work order for the work of Providing, installation of Pumping machineries with other allied electro-mechanical accessories for Augmentation for KULDIHI piped water supply scheme (BRGF Phase-I) under Bankura Mechanical Division, PHE Dte. Block : Sarenga , Dist: Bankura Driller-in-Charge Junior Engineer ORD/000135/2024-2025 441/BMD 27/06/2024 120 ABHIJIT MUKHERJEE 19.59 0.00 0 0
15 BANKURA Bankura Mechanical Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Acceptance cum Formal work order for the work of Providing, installation of Pumping machineries with other electro-mechanical accessories for Augmentation works for Kuldiha & its adjoining mouzas under Sarenga water supply scheme (BRGF Ph-I) under Jal Jeevan Mission Programme under Bankura Mechanical Division, PHE Dte, Dist: Bankura Assistant Engineer,Driller-in-Charge Junior Engineer ORD/000568/2023-2024 2034/BMD 01/09/2023 120 A.K.INDUSTRIES 72.58 0.00 0 0
16 BANKURA Bankura Mechanical Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission Programme. , SM/17302 Augmentation Acceptance cum Formal work order for the work of Providing and installation of Gaseous Chlorination System for Augmentation of Kuldihi water supply scheme under Sarenga water supply scheme (BRGF Ph-I) under Jal Jeevan Mission progremme under Bankura Mechanical Division PHE Dte, Dist :Bankura. Driller-in-Charge Junior Engineer ORD/001094/2023-2024 3069/BMD 12/03/2024 120 PROGRESSIVE ENGINEERS CO-OPERATIVE SOCIETY LIMITED 41.85 0.00 0 0
Total 866.53 275.11 31.75