Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 917.25 216.04 23.55  
1 BANKURA Bankura Division Augmentation of Sub-Surface water based water supply scheme (Left out from BRGF Mouza) for Onda. , SM/17301 Augmentation PAYMENT TO RAIL BILL/00006/2023-2024 FHTC/20 20/04/2023 SOUTH EASTERN RAILWAY 6.30 0.00 0 0
2 BANKURA Bankura Division Augmentation of Sub-Surface water based water supply scheme (Left out from BRGF Mouza) for Onda. , SM/17301 Augmentation Balance allied works of Augmentation of Sub-Surface water based Water Supply Scheme (Left out from BRGF Mouzas for Onda ) along with interconnection and allied works under Bankura Sadar Sub Division of Bankura Division,, PHE Dte. Assistant Engineer Junior Engineer ORD/000170/2024-2025 1810/BQA 11/07/2024 120 GOPAL CHANDRA CHOWDHURY 140.48 0.00 0 0
3 BANKURA Bankura Division Augmentation of Sub-Surface water based water supply scheme (Left out from BRGF Mouza) for Onda. , SM/17301 Augmentation Construction of Boundary Wall at Onda (Zone - II) H/W Site in connection with Jal Jeevan Mission (JJM) for Augmentation of Onda Water Supply Scheme within Onda Block under Bankura Sadar Sub-Division of Bankura Division, P.H.E. Dte. (Total Length:- 300 Mtr.) Assistant Engineer ORD/000213/2024-2025 1864/BQA 12/07/2024 30 SUBHAM CONSTRUCTION 35.29 0.00 0 0
4 BANKURA Bankura Division Augmentation of Sub-Surface water based water supply scheme (Left out from BRGF Mouza) for Onda. , SM/17301 Augmentation Retrofitting works for creation of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) for Augmentation of Sub-Surface water based water supply scheme (Left out from BRGF Mouza) for Onda under Bankura Sadar Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000471/2023-2024 2326/BQA 14/08/2023 270 GOPAL CHANDRA CHOWDHURY 655.34 161.84 24.7 55
5 BANKURA Bankura Mechanical Augmentation of Sub-Surface water based water supply scheme (Left out from BRGF Mouza) for Onda. , SM/17301 Augmentation Acceptance cum Formal work order for the work of Providing of drilling materials for sinking of RBTW for rejuvenation of Onda water supply Scheme connection to JJM Program Block: Onda in the district of Bankura under Bankura Mechanical Division P.H.E Dte Assistant Engineer ORD/000210/2022-2023 1346/BMD 11/11/2022 30 ALPHA ENTERPRISE 23.30 23.19 99.53 0
6 BANKURA Bankura Mechanical Augmentation of Sub-Surface water based water supply scheme (Left out from BRGF Mouza) for Onda. , SM/17301 Augmentation Acceptance cum Formal work order for the work of Providing, installation of Pumping machineries with other electro-mechanical accessories for Augmentation of Sub Surface water based water supply scheme(Left outfrom BRGF Mouza) for Onda under onda block under Bankura Mechanical Division, PHE Dte Dist: Bankura Assistant Engineer ORD/000543/2023-2024 1979/BMD 28/08/2023 120 UNITED TRADERS 56.54 31.01 54.85 55
Total 917.27 216.04 23.55