Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 540.24 54.92 10.17  
1 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). , SM/17245 Augmentation Creation of Balance 'FHTC' (Functional House Hold Tap Connection with Jal Jeevan Mission (JJM) for Augumentation of BARJORA Water Supply Scheme(Left out Mouzas of Barjora Block under B.R.G.F Phase-I) within Barjora Block under Bankura Sadar Sub-Division of Bankura Division, P.H.E Dte.(Zone-IB) Assistant Engineer Junior Engineer ORD/000411/2023-2024 2005/BQA 19/07/2023 270 PRAVAT SARKAR 425.16 24.17 5.68 15
2 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). , SM/17245 Augmentation Soil Investigation work for construction of OHR (600 CUM CAPACITY) under Augmentation of Barjora Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase- I) within Barjora Block under Bankura Sadar Sub Division of Bankura Division, P.H.E. Dte. (Zone- IB) Assistant Engineer Junior Engineer ORD/000887/2023-2024 3038/BQA 06/11/2023 30 K S GROUP 0.49 0.00 0 100
3 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). , SM/17245 Augmentation Support service for detail surveying, cross checking of available LOP and taking level at the interval of 50 mtr. by using survey instrument like DGPS / Drone and detailed design of pipeline by using Watergems Software on the basis of population density for Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). under Bankura Sadar Sub Division of Bankura Division, PHE Dte. Assistant Engineer ORD/001185/2023-2024 437/BQA 08/02/2024 30 LEMNISCATE 1.69 0.00 0 0
4 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). , SM/17245 Augmentation Material Requisition To Resource Division RTOR000101/2023-2024 2732/BQA 03/10/2023 Resource Division 1.86 0.00 0 0
5 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). , SM/17245 Augmentation Material Requisition To Resource Division RTOR000279/2023-2024 193/BQA 22/01/2024 Resource Division 1.86 0.00 0 0
6 BANKURA Bankura Mechanical Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). , SM/17245 Augmentation Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). BILL/00155/2023-2024 null 28/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.00 0.00 0 0
7 BANKURA Bankura Mechanical Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). , SM/17245 Augmentation WBSEDCL, Quotation Bill for new power connection at Bhairabpur Pump House augmentation work under Barjora (Left out mouza) (zone-IB) water supply scheme (SM/17245) BILL/00722/2024-2025 null 21/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 13.18 0.00 0 null
8 BANKURA Bankura Mechanical Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). , SM/17245 Augmentation Acceptance cum Formal work order for the work of Providing and installation of Boosting pumping machineries and other electromechanical accessories at Tail End site for Augmentation work for Barjora water supply scheme (Left out mouzas of Barjora Block under BRGF Phase-I) (Zone-IB) under Bankura Mechanical Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000156/2024-2025 499/BMD 09/07/2024 120 UNITED TRADERS 13.19 0.00 0 0
9 BANKURA Bankura Mechanical Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IB). , SM/17245 Augmentation Providing and installation of High lift & Low Lift pumping machineries and other electromechanical accessories for Augmentation work for Barjora water supply scheme (Left out mouzas of Barjora Block under BRGF Phase-I)( Zone-IB) under Bankura Mechanical Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000325/2023-2024 1400/BMD 18/07/2023 60 M.S. ENTERPRISE 81.81 30.75 37.59 74
Total 540.24 54.92 10.17